Ƶ

Your data doesn't train Genie's AI

You keep IP ownership of your information

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Download a Standard Template

4.6 / 5
4.8 / 5
Access for free
OR

Alternatively: Run an advanced review of an existing
Site Specific Risk Assessment And Method Statement

Let Ƶ's market-leading legal AI identify missing terms, unusual language, compliance issues and more - in just seconds.

What is a Site Specific Risk Assessment And Method Statement?

The Site Specific Risk Assessment And Method Statement (RAMS) is a crucial document required under Danish health and safety legislation for managing workplace risks and establishing safe working procedures. It is mandated by the Danish Working Environment Act and must be prepared before commencing work activities that could pose significant risks to workers or others affected by the work. The document combines two essential elements: a detailed risk assessment that identifies and evaluates potential hazards, and a method statement that outlines the step-by-step procedures for safely executing the work. It must be site-specific, taking into account local conditions, environmental factors, and particular challenges of the location. The RAMS needs to be regularly reviewed and updated to reflect changing site conditions or work methods, and all relevant workers must be briefed on its contents before beginning work.

What sections should be included in a Site Specific Risk Assessment And Method Statement?

1. Document Control: Document version, date, author, reviewers, and revision history

2. Project Information: Site address, project description, scope of works, and key contacts

3. Site Description: Detailed description of the site, including access points, existing structures, and environmental conditions

4. Work Activity Description: Step-by-step breakdown of the planned work activities

5. Risk Assessment Methodology: Explanation of risk rating system and assessment criteria

6. Hazard Identification: List of identified hazards associated with the work activities

7. Risk Assessment: Evaluation of risks, including likelihood and severity ratings

8. Control Measures: Detailed preventive and protective measures to be implemented

9. Method Statement: Detailed safe working procedures and sequence of operations

10. Personnel Requirements: Required qualifications, training, and competencies of workers

11. Equipment and Materials: List of equipment, tools, and materials to be used, including PPE requirements

12. Emergency Procedures: Emergency response plans, first aid arrangements, and evacuation procedures

What sections are optional to include in a Site Specific Risk Assessment And Method Statement?

1. Environmental Impact Assessment: Required when work activities may have significant environmental impacts

2. Noise Assessment: Required for activities involving high noise levels or in noise-sensitive areas

3. COSHH Assessment: Required when handling hazardous substances or materials

4. Manual Handling Assessment: Required for activities involving significant manual handling operations

5. Work at Height Assessment: Required for any activities involving working at height

6. Confined Space Assessment: Required for work in confined spaces

7. Traffic Management Plan: Required when work affects vehicle or pedestrian traffic

8. Temporary Works Assessment: Required when temporary structures or supports are needed

9. Demolition/Dismantling Plan: Required for demolition or major dismantling works

10. Permit to Work Requirements: Required for high-risk activities requiring specific authorization

What schedules should be included in a Site Specific Risk Assessment And Method Statement?

1. Site Layout Plan: Drawings showing site layout, access points, welfare facilities, and work zones

2. Risk Assessment Matrix: Detailed risk rating system and assessment criteria

3. Training Records: Copies of relevant training certificates and competency records

4. Equipment Inspection Certificates: Current inspection certificates for plant and equipment

5. Safety Data Sheets: MSDS/SDS for any hazardous substances to be used

6. Emergency Contact List: List of emergency contacts and key personnel

7. Toolbox Talk Register: Record of safety briefings and attendee signatures

8. PPE Issue Register: Record of PPE issued to workers

9. Method Statement Briefing Record: Sign-off sheet for workers who have been briefed on the RAMS

10. Incident Report Forms: Blank forms for reporting accidents or incidents

Authors

Alex Denne

Head of Growth (Open Source Law) @ Ƶ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents | Serial Founder & Legal AI Author

Relevant legal definitions



































Clauses
























Relevant Industries

Construction

Manufacturing

Industrial

Infrastructure

Energy

Telecommunications

Mining and Quarrying

Utilities

Offshore

Demolition

Renewable Energy

Civil Engineering

Building Maintenance

Transportation

Waste Management

Relevant Teams

Health and Safety

Operations

Project Management

Site Operations

Quality Control

Risk Management

Compliance

Engineering

Construction Management

Environmental

Technical Services

Emergency Response

Facilities Management

Site Supervision

Planning

Relevant Roles

Health and Safety Manager

Site Manager

Project Manager

Safety Officer

Risk Assessment Specialist

Construction Manager

Operations Manager

Safety Consultant

Environmental Manager

Quality Control Manager

Site Supervisor

Works Coordinator

Technical Director

Compliance Officer

Principal Contractor

HSE Advisor

Project Engineer

Safety Engineer

Construction Supervisor

Risk Manager

Industries










Teams

Employer, Employee, Start Date, Job Title, Department, Location, Probationary Period, Notice Period, Salary, Overtime, Vacation Pay, Statutory Holidays, Benefits, Bonus, Expenses, Working Hours, Rest Breaks,  Leaves of Absence, Confidentiality, Intellectual Property, Non-Solicitation, Non-Competition, Code of Conduct, Termination,  Severance Pay, Governing Law, Entire Agreemen

Find the exact document you need

Risk Assessment Questionnaire

Danish-law compliant Risk Assessment Questionnaire for comprehensive workplace hazard identification and evaluation.

find out more

Cyber Threat Assessment

Danish law-governed Cyber Threat Assessment agreement establishing framework for cybersecurity evaluation services, ensuring compliance with Danish and EU regulations.

find out more

Fraud Risk Assessment For Banks

A regulatory-compliant fraud risk assessment document for banking operations in Denmark, addressing key operational risks and control measures under Danish and EU financial regulations.

find out more

Regulatory Compliance Risk Assessment

A detailed assessment of organizational compliance with Danish and EU regulatory requirements, identifying compliance risks and providing recommendations for improvement.

find out more

Livery Yard Risk Assessment

A Danish-compliant risk assessment document for livery yard operations, addressing safety and regulatory requirements under Danish law.

find out more

Risk Assessment Policy

A Danish-compliant policy document outlining organizational risk assessment procedures and requirements under Danish workplace safety legislation.

find out more

Cyber Security Assessment

Danish law-governed Cyber Security Assessment agreement establishing framework for security evaluations with GDPR compliance.

find out more

Risk Assessment Methodology

Danish-law compliant methodology for systematic workplace risk assessment and management, aligned with national safety regulations and EU directives.

find out more

Risk Assessment Cyber Security

A Danish law-compliant cybersecurity risk assessment document analyzing digital security risks and providing mitigation recommendations under Danish and EU regulatory frameworks.

find out more

Coshh Assessment Form

A mandatory Danish workplace safety document for assessing and controlling risks associated with hazardous substances, compliant with Danish and EU regulations.

find out more

Rapid Risk Assessment

A Danish law-compliant document for swift identification and assessment of workplace risks, with immediate action planning and control measures.

find out more

Model Risk Assessment

A regulatory-compliant assessment document under Danish law that evaluates and documents risks associated with financial and business models used in regulated entities.

find out more

Building Risk Assessment

A legally compliant Danish construction risk assessment document that identifies and addresses potential hazards in building projects, aligned with Danish and EU safety regulations.

find out more

Area Risk Assessment

A structured evaluation of workplace hazards and safety measures compliant with Danish regulations and EU safety directives.

find out more

Risk Self Assessment

A Danish law-compliant document for systematic workplace risk identification, assessment, and management.

find out more

Organisational Risk Assessment

A Danish law-compliant document that assesses and documents organizational risks, providing analysis and mitigation strategies in accordance with Danish regulatory requirements.

find out more

Threat Vulnerability Assessment

A Danish law-compliant security assessment document analyzing organizational vulnerabilities and providing remediation recommendations in accordance with national and EU regulations.

find out more

Business Case Risk Assessment

A Danish law-compliant risk assessment document analyzing potential business case risks and providing mitigation strategies and monitoring frameworks.

find out more

Data Breach Assessment

A comprehensive data breach analysis and response document compliant with Danish and EU data protection laws.

find out more

Demolition Risk Assessment

A Danish-compliant risk assessment document for demolition projects, addressing safety hazards and environmental impacts under Danish regulations.

find out more

Cybersecurity Risk Assessment Matrix

A Danish law-compliant framework for systematically assessing and managing organizational cybersecurity risks, aligned with local and EU regulations.

find out more

Vendor Risk Assessment Questionnaire

Danish law-compliant vendor risk assessment questionnaire for evaluating supplier risk profiles and regulatory compliance.

find out more

High Level Risk Assessment

A comprehensive risk evaluation document compliant with Danish law, analyzing and addressing organizational operational, environmental, and safety risks.

find out more

Vulnerability Assessment Matrix

A Danish-compliant security assessment document that systematically evaluates and documents IT infrastructure vulnerabilities and their recommended mitigation strategies.

find out more

Asset Criticality Assessment

A Danish law-compliant document that assesses and documents the criticality level of organizational assets, incorporating local and EU regulatory requirements.

find out more

Financial Crime Risk Assessment

A Danish law-compliant assessment document analyzing an organization's financial crime risks and control frameworks, aligned with EU regulations.

find out more

Startup Risk Assessment

A comprehensive risk assessment document for startups operating under Danish jurisdiction, evaluating legal, operational, financial, and technological risks while ensuring compliance with Danish and EU regulations.

find out more

Site Specific Risk Assessment And Method Statement

A Danish-compliant safety document combining risk assessment and method statements for specific work sites, ensuring compliance with Danish Working Environment regulations.

find out more

Bank Compliance Risk Assessment

A mandatory compliance risk evaluation document for banks operating in Denmark, assessing regulatory risks and controls under Danish and EU banking laws.

find out more

Raw Material Supplier Risk Assessment

A Danish law-governed document for assessing and managing risks associated with raw material suppliers, ensuring compliance with local and EU regulations.

find out more

Compliance Risk Assessment Questionnaire

A structured compliance risk assessment tool aligned with Danish regulatory requirements for evaluating organizational compliance risks and developing mitigation strategies.

find out more

Workplace Assessment

A mandatory Danish workplace safety and health evaluation document that assesses and addresses all significant work environment risks and conditions.

find out more

Last Minute Risk Assessment

A Danish-compliant document for conducting immediate pre-task risk assessments, ensuring workplace safety through systematic hazard evaluation and control measures.

find out more

Factory Risk Assessment

A legally compliant risk assessment document for factory operations under Danish law, identifying hazards and establishing safety protocols.

find out more

Emergency Lighting Risk Assessment

A Danish law-compliant technical assessment evaluating emergency lighting systems against national and EU standards, including risk analysis and improvement recommendations.

find out more

Document Control Risk Assessment

A risk assessment of document control systems and processes, aligned with Danish regulatory requirements and EU standards.

find out more

Criticality Assessment Matrix

A Danish law-governed framework for systematically assessing and categorizing business function criticality and associated risks within organizations.

find out more

Business Continuity Assessment

A Danish law-governed assessment document evaluating an organization's capability to maintain critical operations during disruptions, including risk analysis and improvement recommendations.

find out more

Asset Management Risk Assessment

A Danish-law compliant risk assessment document for asset management activities, addressing key risks and regulatory requirements under Danish and EU financial regulations.

find out more

Country Risk Assessment

A Danish law-compliant Country Risk Assessment document analyzing political, economic, legal, and security risks for business operations in a specific country.

find out more

Daily Risk Assessment

A Danish-compliant daily workplace risk assessment tool for systematic hazard identification and risk control, aligned with national and EU safety regulations.

find out more

Process Risk Assessment

A regulatory-compliant risk assessment document under Danish law that identifies, analyzes, and provides control measures for process-related hazards and risks.

find out more

Dust Risk Assessment

A Danish regulatory-compliant assessment document analyzing workplace dust exposure risks, control measures, and safety recommendations.

find out more

Technical Risk Assessment

A Danish-compliant technical risk assessment document for identifying, analyzing, and mitigating operational risks under Danish and EU regulations.

find out more

Environmental Risk Assessment Matrix

A structured environmental risk assessment tool compliant with Danish and EU environmental regulations, used for evaluating and managing environmental impacts in Denmark.

find out more

Flooring Risk Assessment

A Danish-law compliant risk assessment document for evaluating and managing flooring-related hazards and safety measures in accordance with national and EU regulations.

find out more

Individual Risk Assessment

Danish-law compliant template for conducting and documenting individual workplace risk assessments, aligned with Working Environment Act requirements.

find out more

Hazard Vulnerability Assessment

A Danish law-compliant assessment document analyzing organizational hazards, vulnerabilities, and risks, with recommendations for risk mitigation.

find out more

Audit Risk Assessment

A Danish-compliant audit planning document that assesses engagement risks and determines audit approach in accordance with Danish audit regulations and ISA standards.

find out more

Manual Handling Risk Assessment

A Danish law-compliant workplace safety document that assesses and addresses risks associated with manual handling operations, as required by the Danish Working Environment Act.

find out more

Risk Management Assessment

A Danish law-compliant Risk Management Assessment document evaluating organizational risks and control measures while ensuring regulatory compliance.

find out more

Supply Chain Risk Assessment

A Danish law-compliant framework for assessing and managing supply chain risks, incorporating local regulatory requirements and risk mitigation strategies.

find out more

Security Assessment Report

A Danish law-compliant security evaluation document that assesses organizational security posture and provides recommendations for improvement, adhering to Danish and EU regulatory requirements.

find out more

Supplier Risk Assessment

A Danish law-compliant supplier risk assessment template for evaluating and documenting supplier-related risks and compliance requirements.

find out more

Fire Risk Assessment

A mandatory fire safety evaluation document under Danish law that assesses fire risks and safety measures for properties and facilities.

find out more

Workplace Risk Assessment

Danish-compliant workplace risk assessment document for systematic evaluation of workplace hazards and safety measures under Danish Working Environment Act.

find out more

Simple Risk Assessment

A Danish law-compliant workplace risk assessment document for identifying and managing occupational hazards and safety measures.

find out more

Threat Vulnerability Risk Assessment

A Danish-law compliant security assessment document identifying organizational threats, vulnerabilities, and risks, with recommended mitigation strategies.

find out more

Third Party Risk Assessment

A Danish law-governed document for evaluating and managing risks associated with third-party business relationships, ensuring regulatory compliance and risk mitigation.

find out more

Risk Assessment And Method Statement

A Danish law-compliant document outlining workplace risk assessment and safe working procedures, meeting requirements of the Danish Working Environment Act.

find out more

Forklift Risk Assessment

A Danish-compliant risk assessment document for forklift operations, addressing safety requirements under Danish Working Environment regulations.

find out more

Risk Assessment Report

A Danish-compliant workplace risk assessment report identifying and analyzing workplace hazards, with control measures and recommendations aligned with Danish regulations.

find out more

Activity Based Risk Assessment Form

A Danish-compliant workplace safety document for systematic risk assessment and control of specific work activities, meeting local regulatory requirements.

find out more

Risk Assessment Plan

A legally required Danish workplace safety document that identifies, analyzes, and establishes control measures for organizational risks and hazards.

find out more

Business Continuity Plan Risk Assessment

A Danish law-compliant risk assessment document for evaluating and addressing potential threats to business continuity, aligned with both national and EU regulatory requirements.

find out more

IT Risk Assessment Report

A technical assessment document analyzing IT-related risks and compliance status under Danish and EU regulations, providing recommendations for risk mitigation and control improvements.

find out more

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it