Create a bespoke document in minutes, Â or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Building Risk Assessment
1. 1. Introduction and Scope: Overview of the assessment purpose, project details, and scope of the risk assessment
2. 2. Project Information: Details of the construction project, location, timeline, and key stakeholders
3. 3. Methodology: Description of the risk assessment methodology used, including rating systems for likelihood and severity
4. 4. Hazard Identification: Comprehensive list of identified hazards across all aspects of the construction project
5. 5. Risk Evaluation: Assessment of risks, including likelihood and severity ratings for each identified hazard
6. 6. Control Measures: Detailed preventive and protective measures for each identified risk
7. 7. Emergency Procedures: Emergency response plans and procedures for various scenarios
8. 8. Monitoring and Review: Procedures for ongoing monitoring, review periods, and updating of the risk assessment
9. 9. Roles and Responsibilities: Definition of responsibilities for implementing and maintaining risk controls
1. Special Site Conditions: Include when the construction site has unique geographical, geological, or environmental conditions requiring specific attention
2. Neighboring Properties: Include when construction activities might impact adjacent buildings or properties
3. Environmental Impact Assessment: Include when the project requires specific environmental considerations or permits
4. Traffic Management: Include when construction affects public roads or requires specific traffic management plans
5. Noise and Vibration Assessment: Include when construction activities may cause significant noise or vibration impacts
6. Specialized Equipment Risk Assessment: Include when unusual or high-risk equipment will be used on site
1. Schedule A: Risk Assessment Matrix: Detailed risk assessment matrices and scoring criteria
2. Schedule B: Site Plans and Drawings: Relevant site plans marking hazard zones and safety arrangements
3. Schedule C: Safety Equipment Requirements: Lists of required PPE and safety equipment for different activities
4. Schedule D: Emergency Contact Information: List of emergency contacts, including local authorities and key personnel
5. Schedule E: Inspection Checklists: Standard checklists for regular safety inspections
6. Schedule F: Incident Report Forms: Standard forms for reporting accidents, incidents, and near-misses
7. Schedule G: Training Requirements: Matrix of required safety training for different roles and activities
8. Schedule H: Risk Control Action Plan: Detailed implementation plan for risk control measures with timelines and responsibilities
Authors
Find the exact document you need
Download our whitepaper on the future of AI in Legal
³Ò±ð²Ô¾±±ð’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ³Ò±ð²Ô¾±±ð’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our for more details and real-time security updates.
Read our Privacy Policy.