1. Document Control: Document reference numbers, revision history, and approval status
2. Project Information: Site address, project description, client details, and key contacts
3. Scope of Works: Detailed description of work activities covered by this assessment
4. Risk Assessment Methodology: Explanation of risk rating system and assessment criteria used
5. Site-Specific Hazards: Identification and assessment of hazards specific to the site location
6. Work Activity Risk Assessment: Detailed assessment of risks associated with each work activity
7. Control Measures: Specific measures to minimize identified risks, including PPE requirements
8. Method Statement: Step-by-step procedure for carrying out the work safely
9. Emergency Procedures: Site-specific emergency response plans and evacuation procedures
10. Training Requirements: Required qualifications and training for personnel involved
11. Monitoring and Supervision: Details of how work will be supervised and safety measures monitored
12. Declaration: Signatures of responsible persons and confirmation of understanding
1. Environmental Impact Assessment: Required when work activities may have significant environmental implications
2. Noise Assessment: Include when works involve high noise levels or noise-sensitive areas
3. Traffic Management Plan: Required when works affect vehicle or pedestrian traffic flow
4. Confined Space Entry: Include for any works in confined spaces as defined by BetrSichV
5. Working at Height: Required when activities involve work at height as per BGR/GUV-R 193
6. Hazardous Substances: Include when works involve use of materials covered by GefStoffV
7. Specialist Equipment Operations: Required when using complex or high-risk machinery
8. Permit to Work Systems: Include for high-risk activities requiring specific authorization
9. COVID-19 Measures: Include current pandemic-related safety measures if still relevant
1. Site Layout Plan: Marked-up drawings showing work areas, access routes, and emergency facilities
2. Risk Assessment Matrix: Detailed risk scoring matrices and assessment criteria
3. PPE Requirements Chart: Visual guide to required personal protective equipment
4. Emergency Contact List: Complete list of emergency contacts and responsible persons
5. Equipment Certificates: Copies of relevant equipment inspection and certification documents
6. Training Records: Certificates and qualifications of key personnel
7. COSHH Data Sheets: Safety data sheets for any hazardous substances used
8. Toolbox Talk Records: Documentation of safety briefings and worker acknowledgments
9. Incident Report Forms: Blank forms for reporting accidents or near misses
10. Method Statement Drawings: Technical drawings illustrating safe working methods
Construction
Manufacturing
Industrial Processing
Infrastructure Development
Mining
Utilities
Chemical Industry
Warehousing and Logistics
Renewable Energy
Telecommunications
Waste Management
Transportation
Oil and Gas
Facility Management
Healthcare Construction
Educational Facilities
Retail Construction
Heavy Engineering
Health and Safety
Operations
Project Management
Quality Assurance
Risk Management
Site Operations
Compliance
Technical Services
Environmental
Emergency Response
Training and Development
Facilities Management
Health and Safety Manager
Project Manager
Site Supervisor
Construction Manager
Risk Assessment Specialist
Safety Coordinator
Operations Manager
Quality Control Manager
Technical Director
Compliance Officer
Site Engineer
Construction Foreman
HSE Consultant
Safety Trainer
Project Engineer
Works Coordinator
Safety Inspector
Environmental Manager
Find the exact document you need
Executive Summary Risk Assessment
A German law-compliant executive summary document outlining key organizational risks, control effectiveness, and strategic risk mitigation recommendations.
Task Risk Assessment Matrix
A German law-compliant risk assessment tool that systematically evaluates and controls workplace hazards, aligned with Arbeitsschutzgesetz requirements.
RFP Risk Assessment
A German law-compliant risk assessment document for RFP processes, analyzing potential risks and providing mitigation strategies in accordance with German procurement regulations.
Project Risk Assessment Process
A comprehensive project risk assessment framework compliant with German regulations and industry standards, providing structured methodology for risk identification and management.
Project Assessment Matrix
A German law-compliant framework for systematic project evaluation and assessment, incorporating local regulatory requirements and business practices.
Audit Risk Assessment Matrix
A structured framework for audit risk assessment and evaluation, compliant with German auditing standards and regulations.
Risk Assessment For Grass Cutting And Strimming
German-compliant risk assessment document for grass cutting and strimming operations, addressing safety measures and regulatory requirements under Arbeitsschutzgesetz.
Coal Mining Risk Assessment Report
A technical assessment report under German mining law that evaluates and addresses risks associated with coal mining activities at a specific site, providing recommendations for risk mitigation.
Site Security Assessment Report
A German-law compliant technical evaluation of a site's security measures, vulnerabilities, and recommended improvements, following BSI guidelines and local regulations.
Threat And Hazard Identification And Risk Assessment Guide
A comprehensive guide for workplace threat and hazard assessment compliant with German safety regulations and EU directives.
Cybersecurity Risk Assessment Matrix
A German-law compliant framework for systematic evaluation and documentation of organizational cybersecurity risks, aligned with IT-Sicherheitsgesetz 2.0 and GDPR requirements.
Supplier Security Assessment Questionnaire
A German law-compliant security assessment questionnaire for evaluating suppliers' security controls and regulatory compliance under German and EU regulations.
Vendor Risk Assessment Questionnaire
German law-compliant vendor risk assessment questionnaire for evaluating third-party risks across multiple dimensions including security, data protection, and operational compliance.
Baseline Risk Assessment
A mandatory workplace safety document under German law that identifies, evaluates, and provides control measures for workplace hazards and risks.
Vulnerability Assessment Matrix
A German-compliant security assessment document that evaluates and documents system vulnerabilities, risks, and recommended security measures in accordance with BSI standards and EU regulations.
Hazard Identification Form
A legally mandated German workplace safety document for systematic hazard identification and risk assessment, complying with Arbeitsschutzgesetz requirements.
Procurement Risk Assessment Matrix
A structured risk assessment tool for procurement processes, compliant with German and EU procurement regulations.
Scaffold Risk Assessment And Method Statement
A German-compliant safety and methodology document for scaffolding operations, combining risk assessment and detailed work procedures under German and EU safety regulations.
Tile Manual Handling Risk Assessment
A German-compliant risk assessment document for evaluating and managing hazards associated with manual tile handling in workplace settings.
Site Specific Risk Assessment And Method Statement
A German-compliant safety document combining risk assessment and detailed work procedures, meeting Arbeitsschutzgesetz requirements for site-specific hazard control and safe work execution.
Compliance Risk Assessment Questionnaire
A German law-compliant questionnaire for assessing organizational compliance risks and control effectiveness, meeting BaFin and other regulatory requirements.
Manual Handling Risk Assessment Tool
A German law-compliant risk assessment tool for evaluating and managing manual handling operations risks in the workplace, aligned with ArbSchG and LasthandhabV requirements.
Manual Handling Assessment Chart
A German-compliant risk assessment tool for evaluating and managing manual handling operations risks under German workplace safety regulations.
Lift Plan Risk Assessment
A German-compliant risk assessment document for lifting operations that evaluates safety aspects and ensures regulatory compliance with BetrSichV and DGUV requirements.
Financial Statement Risk Assessment
A German law-compliant assessment document that evaluates and documents financial statement risks and internal control effectiveness, aligned with HGB and KonTraG requirements.
Criticality Assessment Matrix
A German law-compliant framework for evaluating and categorizing organizational assets and processes based on their criticality levels, aligned with BSI standards and IT security requirements.
Business Risk Assessment Questionnaire
A German law-compliant business risk assessment questionnaire for systematic evaluation and documentation of company-wide risks under German regulatory requirements.
Environmental Risk Assessment Matrix
A German law-compliant environmental risk assessment matrix for systematic evaluation and management of environmental risks under German federal and EU regulations.
Painting Risk Assessment And Method Statement
A German-compliant safety and methodology document for painting operations, addressing risk assessment and work procedures under German occupational safety laws.
Summary Of Risk Assessment Report
A legally-required summary document under German law that outlines workplace hazards, risk evaluations, and safety measures based on a comprehensive risk assessment process.
Slip Risk Assessment Report
A technical assessment document compliant with German workplace safety regulations that evaluates slip hazards and provides risk mitigation recommendations.
Workplace Risk Assessment Report
A legally mandated German workplace safety document that evaluates occupational hazards and establishes necessary control measures under the Arbeitsschutzgesetz.
Manual Lifting Risk Assessment
A German regulatory-compliant assessment document that evaluates risks associated with manual handling operations and establishes safety control measures.
Respiratory Hazard Assessment Form
A German regulatory-compliant document for assessing and managing workplace respiratory hazards under the Gefahrstoffverordnung framework.
Manual Handling Assessment Form
A standardized form for assessing manual handling risks and compliance with German workplace safety regulations (LasthandhabV).
Initial Project Risk Assessment
A German law-compliant document that identifies, analyzes, and proposes mitigation measures for potential project risks, adhering to German safety and regulatory requirements.
Fire Safety Assessment Report
A technical evaluation of building fire safety compliance and recommendations under German fire safety regulations and standards.
Pre Task Risk Assessment
A German-compliant safety document for systematic hazard identification and risk control before task execution, following Arbeitsschutzgesetz requirements.
IT Security Risk Assessment Report
A German law-compliant assessment report analyzing IT security risks, compliance status, and recommended security measures in accordance with BSI standards and EU regulations.
Health Hazard Evaluation Form
A German-compliant workplace health hazard assessment document for identifying, evaluating, and controlling occupational health risks under the Arbeitsschutzgesetz framework.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it


.png)