Create a bespoke document in minutes, Â or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Occupied Building Risk Assessment
1. Executive Summary: Overview of key findings, risk levels identified, and critical recommendations
2. Assessment Information: Details of the assessment date, scope, building location, and assessment team members
3. Building Description: Detailed description of the building, including its purpose, occupancy levels, operating hours, and general construction characteristics
4. Methodology: Description of assessment methods, standards applied, and evaluation criteria used
5. Structural Safety Assessment: Evaluation of building's structural integrity and compliance with BR18 requirements
6. Fire Safety Analysis: Assessment of fire prevention systems, escape routes, and compliance with Fire Protection Act requirements
7. Environmental Health Assessment: Evaluation of indoor air quality, ventilation, lighting, and thermal comfort per Danish regulations
8. Accessibility Evaluation: Assessment of building accessibility features and compliance with Danish Accessibility Requirements
9. Emergency Preparedness: Review of emergency procedures, equipment, and evacuation plans
10. Risk Analysis: Detailed analysis of identified risks, their likelihood, and potential impact
11. Recommendations: Prioritized list of recommended actions to address identified risks and compliance issues
12. Conclusion: Summary of overall risk level and key action points
1. Hazardous Materials Assessment: Required when building contains or processes hazardous materials
2. Noise Level Assessment: Required for buildings in industrial areas or with significant noise-generating equipment
3. Special Process Risk Assessment: Required for buildings with specialized industrial processes
4. Historical Conservation Considerations: Required for buildings with cultural or historical significance
5. Security Risk Assessment: Required for buildings with specific security requirements or sensitive operations
1. Schedule A: Floor Plans: Detailed building floor plans highlighting risk areas, emergency exits, and safety equipment locations
2. Schedule B: Photographic Evidence: Photographs documenting identified risks and current safety measures
3. Schedule C: Technical Data: Technical specifications of safety systems and equipment
4. Schedule D: Compliance Checklist: Detailed checklist showing compliance status with relevant Danish regulations
5. Schedule E: Risk Matrix: Detailed risk assessment matrices and calculations
6. Appendix 1: Emergency Procedures: Detailed emergency response procedures and evacuation plans
7. Appendix 2: Maintenance Records: Records of safety equipment maintenance and testing
8. Appendix 3: Previous Assessment History: Summary of previous risk assessments and actions taken
Authors
Find the exact document you need
Download our whitepaper on the future of AI in Legal
³Ò±ð²Ô¾±±ð’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ³Ò±ð²Ô¾±±ð’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our for more details and real-time security updates.
Read our Privacy Policy.