Your data doesn't train Genie's AI
You keep IP ownership of your information
1. Document Control: Document information, revision history, and approval status
2. Project Information: Details of the project, location, dates, and key contacts
3. Scope of Work: Detailed description of work activities to be carried out
4. Risk Assessment: Identification and evaluation of potential hazards and risks
5. Control Measures: Specific measures to eliminate or minimize identified risks
6. Method Statement: Step-by-step description of how work will be carried out safely
7. Resource Requirements: Personnel, equipment, and materials needed for the work
8. Training and Competency: Required qualifications and training for personnel
9. Emergency Procedures: Emergency response plans and first aid arrangements
10. Environmental Controls: Measures to protect the environment during work activities
1. Noise Assessment: Required when work activities may generate significant noise levels
2. COSHH Assessment: Needed when handling hazardous substances
3. Working at Height: Include when activities involve working above ground level
4. Confined Space Entry: Required for work in confined spaces
5. Traffic Management Plan: Include when work affects vehicle or pedestrian movement
6. Waste Management: Required for projects generating significant waste
7. Night Work Provisions: Include for work conducted outside normal hours
8. Specialized Equipment Procedures: Required when using complex or high-risk equipment
1. Risk Assessment Matrix: Detailed risk scoring and evaluation matrix
2. Site Layout Plans: Drawings showing work areas, access points, and safety features
3. Equipment Specifications: Technical details and safety features of major equipment
4. Training Records: Copies of relevant personnel qualifications and certifications
5. Safety Data Sheets: Information about hazardous materials being used
6. Emergency Contact List: List of emergency contacts and procedures
7. Inspection Checklists: Forms for regular safety inspections and checks
8. Toolbox Talk Topics: Safety briefing materials for daily team discussions
9. Permit to Work Templates: Forms for high-risk activities requiring special authorization
Construction
Manufacturing
Oil and Gas
Chemical Processing
Transportation and Logistics
Mining and Extraction
Utilities
Renewable Energy
Infrastructure Development
Maritime Operations
Telecommunications
Waste Management
Healthcare Facilities
Food Processing
Health and Safety
Operations
Project Management
Quality Assurance
Environmental Compliance
Risk Management
Facilities Management
Production
Maintenance
Emergency Response
Technical Services
Compliance and Audit
Training and Development
Health and Safety Manager
Project Manager
Site Supervisor
Risk Assessment Specialist
Operations Manager
Construction Manager
Quality Control Manager
Environmental Compliance Officer
Safety Coordinator
Technical Director
Facilities Manager
Production Supervisor
Maintenance Manager
HSE Consultant
Find the exact document you need
Individual Stress Risk Assessment
A Dutch-law compliant assessment tool for evaluating and managing individual employee stress risks in the workplace, aligned with the Arbeidsomstandighedenwet requirements.
Fire Safety Risk Assessment
A Dutch-compliant fire safety risk assessment document evaluating fire hazards, safety measures, and providing recommendations under Netherlands regulations.
Job Risk Assessment
A mandatory workplace safety and health assessment document under Dutch law that identifies and evaluates occupational risks while establishing necessary control measures.
Coshh Assessment
A Dutch law-compliant assessment document for evaluating and controlling risks from hazardous substances in the workplace, meeting Arbeidsomstandighedenwet requirements.
Fire Risk Assessment Review
A Dutch-law compliant evaluation of a property's fire safety status, including hazard assessment and safety recommendations under the Bouwbesluit framework.
Job Risk Assessment Form
A mandatory Dutch workplace safety assessment document that identifies and evaluates occupational hazards and risks, required under the Netherlands' Working Conditions Act (Arbowet).
Water Risk Assessment
A technical assessment document analyzing water-related risks and mitigation measures under Dutch law, including compliance with national and EU water management regulations.
Risk Assessment For Schools
A comprehensive school risk assessment document compliant with Dutch educational and safety regulations, providing structured evaluation and mitigation strategies for educational institutions in the Netherlands.
Risk Assessment Aged Care
A Dutch-law compliant risk assessment framework for aged care facilities, covering operational, medical, and safety risks in elderly care settings.
Ppe Risk Assessment
A Dutch law-compliant assessment document that identifies workplace hazards and prescribes appropriate Personal Protective Equipment (PPE) requirements.
Bar Risk Assessment
A Dutch-law compliant risk assessment document for evaluating and managing operational and safety risks in bar establishments.
Legionella Risk Assessment For Landlords
A Dutch-compliant legal document for assessing and managing Legionella risks in rental properties, meeting requirements under the Netherlands' water safety regulations.
Food Risk Assessment
A Dutch law-compliant document for systematic evaluation of food safety risks, incorporating NVWA and EU regulatory requirements.
Workplace Risk Assessment
A mandatory Dutch workplace safety document that identifies, evaluates, and provides action plans for addressing occupational health and safety risks under the Working Conditions Act.
Occupational Therapy Risk Assessment
A Dutch-compliant occupational therapy risk assessment document for evaluating and documenting client activity risks and providing mitigation recommendations.
Dynamic Risk Assessment Form
A Dutch-compliant dynamic risk assessment tool for real-time evaluation and control of workplace hazards, aligned with Arbowet requirements.
Food Defence Risk Assessment
A Dutch-compliant assessment document for identifying and mitigating food security threats, aligned with Netherlands and EU food safety regulations.
Food Fraud Vulnerability Assessment
A comprehensive food fraud vulnerability assessment document compliant with Dutch and EU regulations, designed to identify and mitigate food fraud risks in the supply chain.
Third Party Risk Assessment
A Dutch law-governed assessment document for evaluating and managing risks associated with third party service providers and vendors.
Warehouse Risk Assessment
A Dutch law-compliant risk assessment document for warehouse facilities, evaluating operational hazards and providing risk mitigation recommendations.
Travel Risk Assessment
A Dutch law-compliant document that outlines the assessment and management of business travel risks, ensuring organizational duty of care obligations are met.
Stress Risk Assessment
A Dutch law-compliant workplace stress risk assessment document outlining stress factors, impacts, and mitigation strategies as required by the Arbowet.
Step Ladder Risk Assessment
A Dutch-compliant risk assessment document for evaluating and managing workplace safety risks associated with step ladder use, aligned with Arbeidsomstandighedenwet requirements.
Risk Benefit Assessment
A Dutch law-compliant document that systematically evaluates and balances risks and benefits of a specific initiative, providing structured analysis and recommendations.
Risk Assessment And Method Statement
A Dutch-compliant safety document combining risk assessment and detailed work procedures, ensuring safe operations under Netherlands health and safety regulations.
Pregnancy Risk Assessment
A Dutch law-compliant workplace risk assessment document for protecting pregnant employees, including risk evaluation and required workplace adjustments.
Pest Risk Assessment
A technical assessment document under Dutch and EU law that evaluates plant pest risks and recommends control measures for the Netherlands territory.
Legal Risk Assessment
A Dutch law-compliant legal risk assessment document that identifies, analyzes, and provides recommendations for managing organizational legal risks.
Food Safety Risk Assessment
A regulatory-compliant food safety hazard evaluation document under Dutch jurisdiction that identifies, assesses, and establishes controls for food safety risks.
First Aid Risk Assessment
A Dutch law-compliant assessment document evaluating workplace first aid needs and requirements under the Arbowet framework.
Finance Risk Assessment
A Dutch law-compliant financial risk assessment document analyzing and evaluating organizational financial risks in accordance with Wft and EU regulations.
Anti Bribery And Corruption Risk Assessment
A Dutch law-compliant assessment of an organization's bribery and corruption risks, including analysis of operations, controls, and recommendations for enhancement.
Church Risk Assessment
A Dutch-compliant risk assessment document for evaluating and managing safety and preservation risks in church buildings and operations in the Netherlands.
Chemistry Risk Assessment
A mandatory chemical safety compliance document under Dutch law that assesses and manages chemical hazards in the workplace.
Information Security Risk Assessment Form
A Dutch law-compliant Information Security Risk Assessment Form for evaluating and documenting organizational security risks and compliance requirements.
Risk Management Form
A Dutch law-compliant risk management document for systematic risk assessment and control implementation.
Deliberate Risk Assessment Worksheet
A Dutch law-compliant workplace risk assessment document for systematic hazard identification and risk control under the Netherlands' Working Conditions Act.
Job Safety Assessment Form
A Dutch-compliant workplace safety assessment tool for identifying and controlling job-specific hazards, aligned with Arbowet requirements.
Health Risk Assessment Form
Dutch-compliant health risk assessment form for collecting and evaluating individual health information while maintaining GDPR standards.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it


.png)