Ƶ

Risk Assessment And Method Statement for Malaysia

Risk Assessment And Method Statement Template for Malaysia

A Risk Assessment and Method Statement (RAMS) is a comprehensive safety management document required under Malaysian workplace safety regulations, particularly aligned with the Occupational Safety and Health Act 1994 and DOSH guidelines. It combines a systematic evaluation of workplace hazards and their associated risks with a detailed methodology for safely executing specific work tasks. The document serves as both a risk management tool and a practical guide for work execution, ensuring compliance with Malaysian safety standards while providing clear procedures for workers and supervisors.

Your data doesn't train Genie's AI

You keep IP ownership of your information

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Download a Standard Template

4.6 / 5
4.8 / 5
Access for free
OR

Alternatively: Run an advanced review of an existing
Risk Assessment And Method Statement

Let Ƶ's market-leading legal AI identify missing terms, unusual language, compliance issues and more - in just seconds.

What is a Risk Assessment And Method Statement?

The Risk Assessment And Method Statement (RAMS) is a crucial document required for high-risk or complex work activities in Malaysia, mandated under the framework of the Occupational Safety and Health Act 1994 and related DOSH regulations. It serves dual purposes: first, as a systematic analysis of potential hazards and their control measures, and second, as a detailed procedural guide for safe work execution. The document is essential for activities where careful planning and risk mitigation are necessary to ensure worker safety and regulatory compliance. RAMS must be prepared before work commencement and requires regular review and updates to reflect changing site conditions or work methods. It forms a key part of Malaysia's workplace safety documentation requirements and must be available for inspection by relevant authorities.

What sections should be included in a Risk Assessment And Method Statement?

1. Document Control: Document reference number, revision history, and approval status

2. Project Information: Project details, location, dates, and scope of works covered by this RAMS

3. Responsible Persons: Key personnel involved in the work, their roles, responsibilities, and contact information

4. Work Scope Description: Detailed description of the activities to be carried out under this RAMS

5. Risk Assessment: Systematic identification of hazards, risk evaluation, and existing control measures

6. Risk Matrix: Risk scoring methodology and risk classification system used

7. Control Measures: Detailed preventive and protective measures to be implemented

8. Method Statement: Step-by-step procedure for carrying out the work safely

9. Resource Requirements: Personnel, equipment, tools, and materials needed for the work

10. Training Requirements: Required qualifications, certifications, and training for personnel

11. PPE Requirements: Personal protective equipment required for different activities

12. Emergency Procedures: Emergency response plans and evacuation procedures

What sections are optional to include in a Risk Assessment And Method Statement?

1. Environmental Impact Assessment: Required when work activities may have significant environmental impact

2. Noise Assessment: Required for activities involving high noise levels or in noise-sensitive areas

3. Traffic Management Plan: Required when work affects public roads or site traffic

4. Confined Space Entry: Required for any work in confined spaces

5. Working at Height: Required for activities conducted above ground level

6. Chemical Risk Assessment: Required when hazardous chemicals are involved in the work

7. Heavy Lifting Operations: Required for crane operations or heavy load handling

8. Hot Work Procedures: Required for welding, cutting, or other hot work activities

What schedules should be included in a Risk Assessment And Method Statement?

1. Risk Assessment Matrix: Detailed risk scoring tables and evaluation criteria

2. Site Layout Plan: Drawing showing work area, access points, and emergency facilities

3. Equipment Certificates: Copies of relevant equipment inspection and test certificates

4. Training Records: Copies of relevant personnel training and competency certificates

5. MSDS/SDS: Material Safety Data Sheets for any hazardous substances used

6. Emergency Contact List: List of emergency contacts and response team members

7. Toolbox Talk Topics: List of safety topics to be covered in daily briefings

8. Incident Report Forms: Template forms for reporting accidents or near misses

9. Daily Inspection Checklist: Templates for daily safety inspections and checks

Authors

Alex Denne

Head of Growth (Open Source Law) @ Ƶ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents | Serial Founder & Legal AI Author

Jurisdiction

Malaysia

Publisher

Ƶ

Document Type

Method Statement

Cost

Free to use
Relevant legal definitions








































Clauses




















Relevant Industries

Construction

Manufacturing

Oil and Gas

Mining

Chemical Processing

Infrastructure Development

Utilities

Telecommunications

Heavy Industry

Logistics and Warehousing

Facilities Management

Marine and Offshore

Industrial Maintenance

Renewable Energy

Relevant Teams

Health Safety Environment

Operations

Project Management

Risk Management

Quality Assurance

Engineering

Maintenance

Compliance

Emergency Response

Site Operations

Technical Services

Relevant Roles

Health and Safety Manager

Project Manager

Site Supervisor

Risk Assessment Specialist

Safety Officer

Operations Manager

Construction Manager

Maintenance Supervisor

HSE Coordinator

Quality Control Manager

Engineering Manager

Technical Director

Compliance Officer

Work Permit Issuer

Safety Consultant

Industries








Teams

Employer, Employee, Start Date, Job Title, Department, Location, Probationary Period, Notice Period, Salary, Overtime, Vacation Pay, Statutory Holidays, Benefits, Bonus, Expenses, Working Hours, Rest Breaks,  Leaves of Absence, Confidentiality, Intellectual Property, Non-Solicitation, Non-Competition, Code of Conduct, Termination,  Severance Pay, Governing Law, Entire Agreemen

Find the exact document you need

Method Statement For Cutting Concrete Slab

A technical document outlining methodology and safety procedures for concrete slab cutting operations in compliance with Malaysian construction and safety regulations.

Download

Cofferdam Construction Method Statement

A Malaysian-compliant technical document outlining the methodology and safety procedures for cofferdam construction, following DOSH and CIDB requirements.

Download

Method Statement For Column Formwork

A technical document outlining procedures and requirements for column formwork installation in Malaysian construction projects, complying with local regulations and standards.

Download

Method Statement For Demolition Of Concrete Slab

A Malaysian-compliant technical document outlining safe and regulated procedures for concrete slab demolition works.

Download

Risk Assessment And Method Statement

A Malaysian-compliant safety document combining risk assessment and detailed work procedures, meeting DOSH requirements for workplace safety management.

Download

Aluminium Formwork Method Statement

A technical document detailing aluminum formwork installation procedures and safety requirements for construction projects in Malaysia, compliant with local regulations and standards.

Download
See more related templates

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it