Your data doesn't train Genie's AI
You keep IP ownership of your information
1. Document Control Information: Contains document reference number, revision history, and approval status
2. Project Details: Specific information about the project, location, dates, and scope of work
3. Responsible Persons: Details of key personnel including project manager, safety officer, and supervisors
4. Work Description: Detailed description of the work to be carried out, including sequence of operations
5. Resource Requirements: List of personnel, equipment, materials, and tools required for the work
6. Risk Assessment Matrix: Standard risk assessment matrix showing likelihood and severity ratings
7. Hazard Identification: Comprehensive list of all potential hazards associated with the work
8. Risk Evaluation: Assessment of risks associated with each identified hazard
9. Control Measures: Detailed preventive and protective measures for each identified risk
10. Method Statement: Step-by-step procedure for carrying out the work safely
11. Emergency Procedures: Specific emergency response procedures and contact information
12. PPE Requirements: Detailed list of required Personal Protective Equipment
13. Training Requirements: Specific training and competency requirements for personnel
1. Environmental Impact Assessment: Required when work has significant environmental implications
2. Noise Assessment: Needed for works involving high noise levels or in noise-sensitive areas
3. Traffic Management Plan: Required for works affecting public roads or vehicle movements
4. Confined Space Entry Procedures: Necessary when work involves confined space operations
5. Working at Height Procedures: Required for any work conducted at height
6. Lifting Operations: Needed when crane or lifting operations are involved
7. Hazardous Substance Assessment: Required when handling dangerous or hazardous materials
8. Permit to Work Systems: Necessary for high-risk activities requiring specific authorization
1. Risk Assessment Forms: Blank and completed risk assessment forms for specific tasks
2. Equipment Inspection Checklists: Detailed checklists for equipment inspection and maintenance
3. Training Records: Copies of relevant training certificates and competency records
4. Site Layout Plans: Drawings showing work areas, access routes, and emergency exits
5. Emergency Contact Details: List of emergency contacts and first aiders
6. Toolbox Talk Records: Records of safety briefings and toolbox talks
7. Method Statement Briefing Record: Sign-off sheets for worker acknowledgment of RAMS
8. Incident Report Forms: Template forms for reporting accidents and incidents
Construction
Manufacturing
Mining
Oil and Gas
Chemical Processing
Infrastructure Development
Power Generation
Transportation
Telecommunications
Heavy Industry
Warehousing and Logistics
Healthcare Facilities
Waste Management
Marine Operations
Health and Safety
Operations
Project Management
Quality Assurance
Risk Management
Compliance
Engineering
Production
Maintenance
Environmental
Site Operations
Technical Services
Emergency Response
Training and Development
Health and Safety Manager
Project Manager
Site Supervisor
Risk Assessment Specialist
Safety Officer
Operations Manager
Construction Manager
Compliance Officer
Quality Control Manager
Environmental Health Officer
Site Engineer
Production Manager
Maintenance Supervisor
Technical Director
HSE Coordinator
Find the exact document you need
Pre Job Safety Assessment Form
A mandatory safety assessment document used in Indian workplaces to identify and control potential hazards before starting work activities, complying with Indian occupational safety regulations.
Infection Control Risk Assessment Form For (Construction)
A regulatory compliance document used in Indian healthcare facilities to assess and manage infection control risks during construction activities, aligned with national healthcare and building standards.
Industrial Risk Assessment
A regulatory-compliant risk assessment document under Indian law that identifies, analyzes, and provides mitigation strategies for industrial hazards and risks.
Hospital Safety Risk Assessment
A comprehensive safety risk assessment document for healthcare facilities in India, evaluating various safety aspects and providing risk mitigation recommendations.
Hospital Risk Assessment
A comprehensive hospital risk assessment document compliant with Indian healthcare regulations and NABH standards, designed to identify and mitigate healthcare facility risks.
Home Working Risk Assessment
An India-compliant risk assessment document for evaluating and managing health, safety, and security risks associated with remote working arrangements.
Home Risk Assessment Form
An Indian jurisdiction document for comprehensive residential property risk assessment, compliant with national building codes and safety regulations.
Eyewash Risk Assessment Form
An Indian workplace safety document for assessing eye hazards and eyewash facilities, ensuring compliance with The Factories Act, 1948 and state regulations.
Fire Risk Assessment Review
A comprehensive evaluation of fire safety measures and risks in accordance with Indian fire safety regulations, providing detailed recommendations for compliance and improvements.
Environment Of Care Risk Assessment
An environmental risk and safety assessment document for healthcare facilities in India, ensuring compliance with national environmental and healthcare facility standards.
Contractors Risk Assessment
A regulatory-compliant risk assessment document under Indian law for evaluating and managing contractor-related hazards and safety measures in construction and development projects.
Construction Fire Risk Assessment
A mandatory fire safety evaluation document for construction projects in India, ensuring compliance with national and state-level fire safety regulations.
Care Home Fire Risk Assessment
A mandatory fire safety assessment document for Indian care homes, ensuring compliance with national and state fire safety regulations while protecting vulnerable residents.
Task Based Risk Assessment
A comprehensive safety document that identifies, evaluates, and controls task-specific workplace risks, compliant with Indian safety regulations and standards.
Site Risk Assessment
A mandatory risk assessment document under Indian law that evaluates and documents site-specific hazards, safety measures, and compliance requirements.
Job Risk Assessment Form
A standardized form for workplace hazard identification and risk assessment, compliant with Indian safety regulations and labor codes.
First Aid Needs Assessment Form
An assessment form for evaluating workplace first aid requirements and ensuring compliance with Indian safety regulations and statutory requirements.
Water Risk Assessment
A detailed evaluation of water-related risks and mitigation strategies for operations in India, complying with national and state-level water regulations.
Model Risk Assessment
A regulatory-compliant framework for assessing model risks in Indian financial institutions, following RBI guidelines and Basel III standards.
Government Risk Assessment
An Indian government-compliant risk assessment document for analyzing and evaluating operational and strategic risks in public sector operations.
Construction Risk Assessment Form
An Indian regulatory-compliant form for assessing and managing construction site risks and safety measures under Indian construction safety laws.
Building Risk Assessment
A comprehensive evaluation of building-related risks and safety measures compliant with Indian construction and safety regulations.
Area Risk Assessment
A detailed risk evaluation document compliant with Indian safety and environmental regulations, analyzing potential hazards and providing mitigation recommendations for a specified area.
Pharmacy Risk Assessment
A regulatory-compliant risk assessment framework for pharmacies in India, evaluating operational, safety, and compliance risks while providing mitigation strategies.
Organisational Risk Assessment
A comprehensive risk assessment document that evaluates organizational risks and mitigation strategies in compliance with Indian regulatory requirements.
Makeup Artist Risk Assessment
An Indian law-compliant risk assessment template for makeup artists, outlining safety protocols and hazard mitigation strategies for cosmetic application services.
Forestry Risk Assessment
A detailed risk assessment document for forest-related activities in India, analyzing environmental, social, and regulatory risks while ensuring compliance with Indian forest legislation.
Risk Assessment Childcare
A comprehensive risk assessment template for Indian childcare facilities, ensuring compliance with national safety regulations and operational standards.
Smoking Risk Assessment
A risk assessment document for managing smoking-related hazards and ensuring compliance with Indian tobacco control and workplace safety regulations.
Plant And Equipment Risk Management Form
An Indian regulatory-compliant form for comprehensive risk assessment and management of industrial plant and equipment operations.
Ppe Risk Assessment
A structured assessment document for Personal Protective Equipment requirements and implementation, ensuring compliance with Indian workplace safety regulations.
Machine Guarding Assessment
A technical evaluation of industrial machine guarding systems' compliance and adequacy under Indian safety regulations and standards.
New And Expectant Mothers Risk Assessment
An Indian law-compliant risk assessment document for protecting pregnant employees and new mothers in the workplace, addressing various occupational hazards and necessary control measures.
Bar Risk Assessment
A comprehensive risk assessment framework for bar operations in India, incorporating state and national regulatory requirements for safety, hygiene, and alcohol service compliance.
Machine Guarding Risk Assessment
A technical safety assessment document evaluating machinery hazards and guarding requirements in accordance with Indian industrial safety regulations and the Factories Act 1948.
Field Level Hazard Assessment
A standardized safety assessment document used in Indian industrial operations to identify and mitigate workplace hazards, compliant with national safety regulations.
Home Visit Risk Assessment
An Indian jurisdiction-compliant risk assessment template for healthcare professionals conducting home visits, addressing safety, security, and healthcare delivery requirements.
Pre Job Hazard Assessment
A comprehensive hazard assessment and control document compliant with Indian safety regulations, used to identify and mitigate workplace risks before starting work activities.
Formal Hazard Assessment
A mandatory workplace hazard evaluation and risk assessment document compliant with Indian safety regulations and workplace safety laws.
Application Security Risk Assessment
An Indian law-governed agreement for conducting application security risk assessments, outlining testing scope, methodology, and compliance requirements.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it


.png)