Ƶ

Method Statement Generator for United Arab Emirates

Create a bespoke document in minutes, or upload and review your own.

4.6 / 5
4.8 / 5

Let's create your document

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Get your first 2 documents free

Your data doesn't train Genie's AI

You keep IP ownership of your information

Key Requirements PROMPT example:

Method Statement

I need a method statement for a construction project in the UAE, detailing the step-by-step procedures for safely executing a specific task, including risk assessments, necessary equipment, and compliance with local safety regulations. The document should also outline the roles and responsibilities of the team members involved and include a contingency plan for potential hazards.

What is a Method Statement?

A Method Statement is a detailed work plan that construction companies and contractors in the UAE must prepare before starting any significant project. It spells out exactly how a team will carry out specific tasks safely and efficiently, following local construction codes and OSHAD requirements.

Project managers use Method Statements alongside risk assessments to guide their workers through complex procedures, from excavation to high-rise construction. The document covers everything from the equipment needed and safety measures to the step-by-step sequence of work activities, making it an essential tool for meeting Abu Dhabi and Dubai Municipality compliance standards.

When should you use a Method Statement?

Create a Method Statement before starting any high-risk construction or industrial activity in the UAE. This document becomes essential when planning complex tasks like crane operations, working at heights, demolition work, or handling hazardous materials - especially on projects regulated by Abu Dhabi's OSHAD or Dubai Municipality.

A new Method Statement is needed whenever your team introduces new equipment, changes work procedures, or starts work in different site conditions. It's particularly important when coordinating multiple contractors, managing confined space entry, or undertaking specialized technical operations that require careful sequencing and safety protocols.

What are the different types of Method Statement?

Who should typically use a Method Statement?

  • Project Managers: Create and oversee Method Statements, ensuring alignment with UAE construction regulations and OSHAD requirements
  • HSE Officers: Review and validate safety protocols, emergency procedures, and risk control measures within the statement
  • Site Engineers: Provide technical input and supervise implementation of work procedures outlined in the document
  • Contractors: Follow the detailed work instructions and safety guidelines while executing tasks on-site
  • Municipal Inspectors: Verify compliance with local building codes and safety standards during site visits

How do you write a Method Statement?

  • Project Details: Collect site location, scope of work, and timeline for each construction phase
  • Risk Assessment: Document potential hazards, control measures, and emergency procedures specific to UAE conditions
  • Resource Planning: List required equipment, materials, and qualified personnel needed for each task
  • Local Compliance: Review current OSHAD requirements and municipality regulations for your specific activity
  • Team Input: Gather feedback from site supervisors and HSE officers on practical implementation
  • Document Review: Use our platform's UAE-specific templates to ensure all mandatory sections are included and properly formatted

What should be included in a Method Statement?

  • Project Information: Site details, scope of work, and expected duration as per UAE construction permits
  • Safety Protocols: Detailed OSHAD-compliant safety measures, PPE requirements, and emergency procedures
  • Work Sequence: Step-by-step breakdown of activities following Dubai Municipality guidelines
  • Resource Details: List of equipment, materials, and qualified personnel with relevant UAE certifications
  • Risk Controls: Specific hazard mitigation measures aligned with local safety standards
  • Approval Section: Designated spaces for HSE officer, project manager, and client representative signatures
  • Supporting Documents: References to relevant permits, drawings, and safety data sheets

What's the difference between a Method Statement and a Statement of Work?

A Method Statement differs significantly from a Statement of Work in several key aspects, though both documents play important roles in UAE project management. While Method Statements focus specifically on safety procedures and detailed work execution plans, Statements of Work outline broader project deliverables and commercial terms.

  • Scope and Detail: Method Statements provide step-by-step technical instructions and safety protocols, while Statements of Work cover project objectives, timelines, and deliverables
  • Primary Purpose: Method Statements ensure safe work execution and OSHAD compliance, whereas Statements of Work establish contractual obligations and project boundaries
  • Key Users: Method Statements guide on-site workers and safety officers; Statements of Work serve project managers and contract administrators
  • Legal Context: Method Statements fulfill safety regulatory requirements, while Statements of Work form part of contractual documentation

Get our United Arab Emirates-compliant Method Statement:

Access for Free Now
*No sign-up required
4.6 / 5
4.8 / 5

Find the exact document you need

Method Of Statement For Cable Termination

A technical procedure document for cable termination works in the UAE, compliant with local electrical regulations and safety standards.

find out more

Method Statement For Column Formwork

A technical document outlining methodology and safety requirements for column formwork operations in UAE construction projects, ensuring compliance with local regulations and international standards.

find out more

Method Statement For Demolition Of Concrete Slab

UAE-compliant technical document detailing methodology and safety procedures for concrete slab demolition works.

find out more

Aluminium Formwork Method Statement

A UAE-compliant technical procedure document for aluminum formwork operations in construction projects, adhering to local regulations and international standards.

find out more

Download our whitepaper on the future of AI in Legal

By providing your email address you are consenting to our Privacy Notice.
Thank you for downloading our whitepaper. This should arrive in your inbox shortly. In the meantime, why not jump straight to a section that interests you here: /our-research
Oops! Something went wrong while submitting the form.

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

Our bank-grade security infrastructure undergoes regular external audits

We are ISO27001 certified, so your data is secure

Organizational security

You retain IP ownership of your documents

You have full control over your data and who gets to see it

Innovation in privacy:

Genie partnered with the Computational Privacy Department at Imperial College London

Together, we ran a £1 million research project on privacy and anonymity in legal contracts

Want to know more?

Visit our for more details and real-time security updates.