1. Project Information: Details of the project, site location, client, principal contractor, and scope of scaffolding work
2. Responsible Persons: Names and contact details of key personnel including site supervisor, safety officer, scaffold inspector, and emergency contacts
3. Scope of Work: Detailed description of scaffolding work to be undertaken, including type of scaffold, height, duration, and purpose
4. Risk Assessment: Identification of hazards, risk evaluation, and control measures specific to the scaffolding work
5. Method Statement: Step-by-step procedure for scaffold erection, use, and dismantling, including safety measures at each stage
6. Equipment and Materials: List of scaffolding components, tools, and equipment to be used, including specifications and inspection requirements
7. PPE Requirements: Detailed list of required Personal Protective Equipment for different activities
8. Training Requirements: Specification of required training and competency certificates for workers involved
9. Emergency Procedures: Emergency response plans, including rescue procedures for working at height
10. Environmental Considerations: Assessment of environmental factors affecting scaffold safety including weather conditions
1. Specialized Access Requirements: Additional procedures for complex access requirements or unusual scaffold configurations
2. Public Protection Measures: Required when scaffolding is erected in public areas or near occupied buildings
3. Heavy Load Considerations: Required when scaffold will be used for material storage or heavy equipment support
4. Interface with Other Works: Required when scaffold work interfaces with other construction activities
5. Special Weather Provisions: Required for exposed locations or areas with extreme weather conditions
6. Noise Assessment: Required when scaffold work involves noisy operations in sensitive areas
1. Schedule A - Daily Inspection Checklist: Template for daily scaffold inspection records
2. Schedule B - Scaffold Tags and Permits: Examples and templates for scaffold safety tags and work permits
3. Schedule C - Training Records: Copies of relevant training certificates and competency records
4. Schedule D - Equipment Certification: Certificates for scaffold components and safety equipment
5. Schedule E - Risk Assessment Matrix: Detailed risk evaluation matrices and scoring systems
6. Appendix 1 - Site Layout Plans: Drawings showing scaffold locations and access routes
7. Appendix 2 - Technical Drawings: Detailed scaffold design drawings and specifications
8. Appendix 3 - Emergency Contact List: Comprehensive list of emergency contacts and procedures
9. Appendix 4 - Toolbox Talk Topics: Safety briefing materials for daily team meetings
Construction
Mining
Industrial Manufacturing
Oil and Gas
Commercial Building Maintenance
Infrastructure Development
Power Generation
Telecommunications
Maritime and Shipyards
Renewable Energy
Health and Safety
Operations
Construction
Project Management
Quality Control
Risk Management
Site Operations
Compliance
Engineering
Maintenance
Health and Safety Manager
Site Supervisor
Scaffold Inspector
Construction Manager
Project Manager
Risk Assessment Officer
Safety Officer
Construction Supervisor
Scaffold Erector
Safety Consultant
Operations Manager
Quality Control Inspector
Site Engineer
Compliance Officer
HSE Coordinator
Find the exact document you need
Fire Risk Assessment For Self Catering Accommodation
A South African-compliant fire risk assessment document for self-catering accommodations, evaluating fire safety measures and providing risk mitigation recommendations.
Cctv Risk Assessment
A South African-compliant CCTV risk assessment document that evaluates security needs, privacy impacts, and technical requirements while ensuring POPIA compliance.
Building Survey Risk Assessment
A South African legal document assessing building-related risks, safety concerns, and compliance requirements, providing recommendations for risk mitigation.
Bcm Risk Assessment
A South African-compliant Business Continuity Management Risk Assessment document that evaluates potential business disruption risks and provides mitigation strategies.
Baseline Risk Assessment For (Construction)
A mandatory risk assessment document under South African law that identifies and controls construction project hazards, required before commencing any construction work.
Fire Risk Assessment For Restaurants
A South African-compliant fire risk assessment template for restaurants, evaluating fire hazards and safety measures in accordance with national regulations.
Restaurant Fire Risk Assessment
A South African-compliant fire risk assessment document for restaurants, evaluating fire safety aspects and providing recommendations under local regulations.
Covid Hazard Assessment
A South African workplace COVID-19 risk assessment document that evaluates and establishes control measures for managing COVID-19 transmission risks in compliance with local health and safety regulations.
Fraud Risk Assessment For Banks
A regulatory-compliant fraud risk assessment framework for South African banks, incorporating local banking laws and international best practices.
Night Worker Risk Assessment
A South African legal compliance document for assessing and managing risks associated with night work operations under OHSA and BCEA requirements.
Livery Yard Risk Assessment
A South African-compliant risk assessment template for livery yards, addressing facility, horse handling, and staff safety requirements under local health and safety regulations.
Field Level Risk Assessment
A South African regulatory-compliant document that systematically evaluates and controls operational risks in specific field environments.
Risk Assessment Policy
A South African-compliant policy document outlining the organization's approach to risk assessment, management procedures, and regulatory compliance requirements.
Cherry Picker Risk Assessment
A South African regulatory-compliant risk assessment document for safe cherry picker operations, aligned with OH&S Act requirements.
Liquidity Risk Assessment
A regulatory-compliant assessment of an organization's liquidity risk profile and management framework under South African financial law and Basel III requirements.
Information Security Risk Assessment Report
A detailed assessment of an organization's information security risks and controls, providing recommendations aligned with South African regulatory requirements and international standards.
Eyewash Risk Assessment Form
A South African workplace safety document for assessing risks and requirements related to eyewash facilities, compliant with OHS Act and SANS standards.
Continuous Risk Assessment
A South African law-compliant framework for implementing and maintaining an ongoing risk assessment process in organizational settings.
Construction Fire Risk Assessment
A mandatory South African construction document that evaluates fire risks, prevention measures, and emergency procedures for construction sites under national building and safety regulations.
Community Event Risk Assessment
A South African-compliant risk assessment framework for community events, ensuring comprehensive risk management and regulatory compliance.
Baseline Risk Assessment For Road (Construction)
A South African legal compliance document for identifying and managing risks in road construction projects, aligned with OHS Act requirements and Construction Regulations.
Risk Assessment Science Experiment
A comprehensive risk assessment template for scientific experiments, compliant with South African safety regulations and research protocols.
Risk Maturity Assessment Report
A comprehensive evaluation of an organization's risk management capabilities and maturity level, aligned with South African regulatory requirements and governance standards.
Risk Assessment Questionnaire For Banks
A comprehensive risk assessment tool for South African banks, aligned with local banking regulations and Basel III requirements.
Mobile Plant Risk Assessment
A South African OHS Act-compliant risk assessment document for evaluating and controlling hazards associated with mobile plant equipment operations.
Home Risk Assessment
A South African legal document detailing comprehensive residential property risk assessment and safety evaluation, aligned with national building and safety regulations.
Government Risk Assessment
A South African government-focused risk assessment document that evaluates and addresses organizational risks in compliance with national legislation and public sector requirements.
Compressed Air Risk Assessment
A South African OHS-compliant risk assessment document for evaluating and managing hazards associated with industrial compressed air systems.
Worksite Assessment
A South African law-compliant document for evaluating workplace safety, hazards, and compliance with OHS regulations.
Risk Assessment Log
A South African workplace document for systematically recording and managing occupational hazards and risks in compliance with OHS Act requirements.
Risk And Control Assessment
A South African regulatory-compliant document for systematic assessment of organizational risks and control effectiveness, aligned with King IV Code requirements.
Organisational Risk Assessment
A systematic evaluation of organizational risks compliant with South African legislation, providing comprehensive risk identification, analysis, and management strategies.
Forestry Risk Assessment
A South African forestry risk assessment document evaluating environmental, operational, and safety risks while ensuring compliance with local forestry regulations.
Smoking Risk Assessment
A South African law-compliant assessment document for evaluating and managing smoking-related risks in workplaces and public spaces.
Pressure Washing Risk Assessment
A South African OHS Act-compliant risk assessment document for pressure washing operations, detailing hazards, risks, and safety controls.
Personal Security Risk Assessment
A South African law-compliant security risk assessment document that evaluates personal security threats and provides protective measure recommendations.
Person Centred Risk Assessment
A South African law-compliant person-centered risk assessment document that evaluates and manages potential risks to an individual's health, safety, and wellbeing while respecting personal autonomy.
Participant Risk Assessment
A South African compliance document for assessing and managing individual participant risks in workplace activities, aligned with OHSA requirements.
Machine Guarding Assessment
A technical safety evaluation report assessing machine guarding compliance and recommendations under South African health and safety legislation.
New And Expectant Mothers Risk Assessment
A South African workplace risk assessment document designed to identify and mitigate risks to pregnant and nursing employees, ensuring compliance with local health and safety legislation.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it


.png)