Scaffold Risk Assessment And Method Statement Template for New Zealand

Create a bespoke document in minutes,  or upload and review your own.

4.6 / 5
4.8 / 5

Let's create your Scaffold Risk Assessment And Method Statement

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Get your first 2 documents free

Your data doesn't train Genie's AI

You keep IP ownership of your information

Key Requirements PROMPT example:

Scaffold Risk Assessment And Method Statement

"I need a Scaffold Risk Assessment and Method Statement for a 4-story commercial building renovation project in Auckland CBD, starting March 2025, where scaffolding will be erected along the building's exterior for facade maintenance work."

Document background
The Scaffold Risk Assessment And Method Statement is a crucial document required for any scaffolding work in New Zealand, designed to ensure compliance with the Health and Safety at Work Act 2015 and associated regulations. This document is essential when planning, executing, and managing scaffolding operations, whether for construction, maintenance, or renovation projects. It provides a comprehensive framework for identifying potential hazards, implementing control measures, and establishing safe work procedures. The RAMS must be prepared before commencing any scaffolding work and should be regularly reviewed and updated throughout the project lifecycle. It serves as a key reference document for all stakeholders involved in scaffolding operations and demonstrates compliance with New Zealand's strict workplace safety requirements.
Suggested Sections

1. Project Information: Details of the project including site address, client details, scope of scaffolding work, and project duration

2. Responsible Persons: List of key personnel including project manager, site supervisor, scaffolding supervisor, and safety officer with their contact details and responsibilities

3. Site Description: Detailed description of the work site, access points, ground conditions, and surrounding environment

4. Risk Assessment: Comprehensive assessment of all potential hazards, risk levels, and existing control measures

5. Control Measures: Detailed description of safety measures implemented to mitigate identified risks

6. Method Statement: Step-by-step procedure for scaffold erection, modification, and dismantling

7. Emergency Procedures: Emergency response plans, evacuation procedures, and emergency contact information

8. Equipment Requirements: List of required scaffolding equipment, tools, and PPE with specifications

9. Training Requirements: Required qualifications, certifications, and training for workers involved

10. Monitoring and Review: Procedures for regular inspections, maintenance, and documentation requirements

Optional Sections

1. Environmental Management: Environmental protection measures when working in sensitive areas or adverse weather conditions

2. Traffic Management: Required for sites where scaffolding work affects public roads or pedestrian access

3. Noise Management: When scaffolding work is conducted in noise-sensitive areas or during restricted hours

4. Public Protection: Additional measures required when working in public areas or near occupied buildings

5. Special Access Requirements: For projects requiring unusual access methods or equipment

6. Temporary Works: When additional temporary structures or supports are required

Suggested Schedules

1. Schedule A - Site Layout Plan: Detailed site plans showing scaffold locations, access points, and safety zones

2. Schedule B - Risk Assessment Matrix: Detailed risk assessment scores and methodology

3. Schedule C - Equipment Specifications: Technical specifications for all scaffolding components and equipment

4. Schedule D - Inspection Checklist: Daily and weekly scaffold inspection forms

5. Schedule E - Training Records: Copies of relevant training certificates and competency records

6. Schedule F - Emergency Contact List: Comprehensive list of emergency contacts and procedures

7. Appendix 1 - Technical Drawings: Detailed scaffold design drawings and calculations

8. Appendix 2 - Manufacturers' Guidelines: Relevant equipment manufacturer specifications and guidelines

9. Appendix 3 - Permits: Copies of relevant work permits and authorizations

10. Appendix 4 - Safety Data Sheets: SDS for any hazardous materials used in the scaffolding process

Authors

Alex Denne

Head of Growth (Open Source Law) @ ¶¶Òõ¶ÌÊÓÆµ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents | Serial Founder & Legal AI Author

Relevant legal definitions



















































Clauses




















Relevant Industries

Construction

Infrastructure

Commercial Property

Industrial

Residential Construction

Mining

Oil and Gas

Telecommunications

Utilities

Maritime

Energy

Relevant Teams

Health and Safety

Operations

Project Management

Site Operations

Quality Assurance

Compliance

Risk Management

Construction Management

Contract Administration

Technical Services

Relevant Roles

Health and Safety Manager

Project Manager

Site Supervisor

Scaffolding Supervisor

Construction Manager

Safety Officer

Risk Assessment Officer

Compliance Manager

Operations Manager

Site Engineer

Works Coordinator

Quality Control Inspector

Contract Administrator

Principal Contractor

Building Inspector

Industries







Teams

Employer, Employee, Start Date, Job Title, Department, Location, Probationary Period, Notice Period, Salary, Overtime, Vacation Pay, Statutory Holidays, Benefits, Bonus, Expenses, Working Hours, Rest Breaks,  Leaves of Absence, Confidentiality, Intellectual Property, Non-Solicitation, Non-Competition, Code of Conduct, Termination,  Severance Pay, Governing Law, Entire Agreemen

Find the exact document you need

Scaffold Risk Assessment And Method Statement

A New Zealand-compliant safety and methodology document for scaffolding works, combining risk assessment and detailed work procedures under NZ health and safety legislation.

find out more

Download our whitepaper on the future of AI in Legal

By providing your email address you are consenting to our Privacy Notice.
Thank you for downloading our whitepaper. This should arrive in your inbox shortly. In the meantime, why not jump straight to a section that interests you here: /our-research
Oops! Something went wrong while submitting the form.

³Ò±ð²Ô¾±±ð’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ³Ò±ð²Ô¾±±ð’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

Our bank-grade security infrastructure undergoes regular external audits

We are ISO27001 certified, so your data is secure

Organizational security

You retain IP ownership of your documents

You have full control over your data and who gets to see it

Innovation in privacy:

Genie partnered with the Computational Privacy Department at Imperial College London

Together, we ran a £1 million research project on privacy and anonymity in legal contracts

Want to know more?

Visit our for more details and real-time security updates.