Ƶ

Scaffold Risk Assessment And Method Statement for India

Scaffold Risk Assessment And Method Statement Template for India

A comprehensive safety and methodology document compliant with Indian construction and safety regulations, particularly The Building and Other Construction Workers Act 1996 and relevant Indian Standards (IS 3696). The document outlines detailed risk assessments and step-by-step procedures for scaffold installation, maintenance, and dismantling operations. It includes specific safety measures, emergency procedures, and control mechanisms required by Indian law, ensuring worker safety and regulatory compliance while providing a structured approach to scaffold management in construction and industrial settings.

Your data doesn't train Genie's AI

You keep IP ownership of your information

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Download a Standard Template

4.6 / 5
4.8 / 5
Access for free
OR

Alternatively: Run an advanced review of an existing
Scaffold Risk Assessment And Method Statement

Let Ƶ's market-leading legal AI identify missing terms, unusual language, compliance issues and more - in just seconds.

What is a Scaffold Risk Assessment And Method Statement?

The Scaffold Risk Assessment And Method Statement (RAMS) is a crucial document required under Indian construction safety regulations, particularly for projects involving work at height. This document is mandatory under The Building and Other Construction Workers Act 1996 and must comply with Indian Standards IS 3696 for scaffold safety. It is required whenever scaffolding work is to be undertaken in construction, maintenance, or industrial settings. The document combines a detailed risk assessment identifying potential hazards and their control measures with a comprehensive method statement outlining the safe working procedures. It serves as both a planning tool and a legal record, demonstrating compliance with Indian safety regulations while providing practical guidance for workers and supervisors involved in scaffolding operations.

What sections should be included in a Scaffold Risk Assessment And Method Statement?

1. Document Control Information: Project details, document version, revision history, and approval status

2. Project Overview: Basic information about the project, location, scope of scaffolding work, and key stakeholders

3. Scope of Work: Detailed description of scaffolding activities to be undertaken, including type of scaffold, height, and purpose

4. Risk Assessment: Identification and evaluation of potential hazards, risk levels, and control measures

5. Method Statement: Step-by-step procedure for scaffold erection, modification, and dismantling

6. Resource Requirements: Details of personnel, equipment, and materials needed for the scaffolding work

7. Safety Measures: Specific safety procedures, PPE requirements, and control measures

8. Emergency Procedures: Response procedures for potential emergencies, including rescue plans

9. Competency Requirements: Required qualifications and certifications for scaffold workers and supervisors

10. Inspection and Maintenance: Procedures for regular scaffold inspection and maintenance protocols

What sections are optional to include in a Scaffold Risk Assessment And Method Statement?

1. Environmental Control Measures: Additional measures for environmental protection, used when working in environmentally sensitive areas

2. Specific Weather Procedures: Special procedures for adverse weather conditions, required for exposed or high-altitude locations

3. Interface Management: Procedures for managing work interfaces with other contractors, needed on complex sites

4. Traffic Management: Specific procedures for managing vehicle and pedestrian traffic, required when scaffolding affects public areas

5. Noise Control Measures: Specific measures for noise reduction, required in noise-sensitive areas or during restricted hours

6. Special Access Arrangements: Detailed access procedures for restricted or sensitive areas

What schedules should be included in a Scaffold Risk Assessment And Method Statement?

1. Appendix A - Risk Assessment Matrix: Detailed risk assessment scoring matrix and methodology

2. Appendix B - Site Layout Plans: Drawings showing scaffold locations, access points, and storage areas

3. Appendix C - Scaffold Design Drawings: Technical drawings and specifications for scaffold structures

4. Appendix D - Emergency Contact Information: List of emergency contacts and response team details

5. Appendix E - Inspection Checklists: Standard forms for scaffold inspection and maintenance records

6. Appendix F - Competency Certificates: Copies of relevant training certificates and competency records

7. Appendix G - Equipment Certificates: Certification and inspection records for scaffold equipment

Authors

Alex Denne

Head of Growth (Open Source Law) @ Ƶ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents | Serial Founder & Legal AI Author

Jurisdiction

India

Publisher

Ƶ

Document Type

Method Statement

Cost

Free to use
Relevant legal definitions








































Clauses




















Relevant Industries

Construction

Infrastructure Development

Industrial Manufacturing

Oil and Gas

Power Generation

Commercial Real Estate

Residential Development

Shipbuilding

Mining

Facilities Management

Petrochemical

Relevant Teams

Health and Safety

Operations

Construction Management

Quality Assurance

Risk Management

Project Management

Site Operations

Compliance

Engineering

Facilities Management

Relevant Roles

Health and Safety Manager

Construction Site Manager

Scaffold Supervisor

Safety Officer

Project Engineer

Risk Assessment Specialist

Construction Manager

Site Safety Coordinator

Quality Control Inspector

Operations Manager

Compliance Officer

Construction Safety Engineer

Industries







Teams

Employer, Employee, Start Date, Job Title, Department, Location, Probationary Period, Notice Period, Salary, Overtime, Vacation Pay, Statutory Holidays, Benefits, Bonus, Expenses, Working Hours, Rest Breaks,  Leaves of Absence, Confidentiality, Intellectual Property, Non-Solicitation, Non-Competition, Code of Conduct, Termination,  Severance Pay, Governing Law, Entire Agreemen

Find the exact document you need

Method Statement For Cutting Concrete Slab

A technical document outlining procedures and safety requirements for concrete slab cutting operations in compliance with Indian construction regulations.

find out more

Cofferdam Construction Method Statement

An Indian regulatory-compliant technical document detailing cofferdam construction methodology, safety measures, and environmental requirements.

find out more

Risk Assessment Method Statement

A comprehensive safety and risk management document that combines risk assessment with methodical work procedures, compliant with Indian health and safety regulations.

find out more

Scaffold Risk Assessment And Method Statement

An Indian regulation-compliant document detailing risk assessment and methodologies for safe scaffold operations, aligned with The Building and Other Construction Workers Act 1996.

find out more

Method Statement For Column Formwork

A technical document outlining methodology for column formwork operations in construction projects, compliant with Indian construction regulations and standards.

find out more

Method Statement For Demolition Of Concrete Slab

A technical document outlining procedures and safety protocols for concrete slab demolition in compliance with Indian construction regulations and safety standards.

find out more

Painting Risk Assessment And Method Statement

A mandatory safety and methodology document for painting operations in India, combining risk assessment with detailed work procedures under Indian safety regulations.

find out more

Aluminium Formwork Method Statement

A technical document outlining procedures and safety requirements for aluminum formwork systems in construction projects, compliant with Indian construction regulations and standards.

find out more

Risk Assessment And Swms

An Indian-compliant Risk Assessment and SWMS document outlining workplace hazards, safety procedures, and control measures for high-risk work activities.

find out more
See more related templates

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it