1. Project Information: Details of the project including site address, client information, and scope of works
2. Site Description: Detailed description of the site, including access points, existing structures, and site conditions
3. Risk Assessment: Comprehensive assessment of all potential hazards and risks associated with the demolition work
4. Control Measures: Detailed preventive and protective measures to mitigate identified risks
5. Method of Work: Step-by-step breakdown of the demolition process, including equipment and techniques to be used
6. Resource Requirements: List of personnel, plant, equipment, and materials required for the work
7. Safety Requirements: Specific safety measures, PPE requirements, and safety protocols to be followed
8. Environmental Controls: Measures to control dust, noise, vibration, and other environmental impacts
9. Waste Management: Procedures for handling, segregating, and disposing of demolition waste
10. Emergency Procedures: Emergency response plans, including first aid and evacuation procedures
1. Asbestos Management: Required when there is potential presence of asbestos in the concrete slab or surrounding materials
2. Traffic Management: Needed when demolition work affects public roads or requires vehicle movement control
3. Temporary Works: Required when temporary supports or structures are needed during demolition
4. Noise Management: Required for sites near sensitive receptors or when working outside standard hours
5. Structural Engineering Assessment: Needed when demolition might affect structural integrity of adjacent structures
6. Public Protection Measures: Required when work is conducted near public areas or occupied buildings
7. Utility Services Protection: Needed when live services are present in or near the demolition area
1. Site Layout Plan: Detailed plan showing work areas, access points, storage areas, and safety features
2. Risk Assessment Matrix: Detailed risk assessment calculations and matrices
3. Equipment Specifications: Technical specifications for major plant and equipment to be used
4. Training Records: Certificates and qualifications of key personnel
5. Emergency Contact List: List of emergency contacts and key project personnel
6. Method Statement Briefing Record: Record of toolbox talks and method statement briefings to workers
7. Inspection Checklists: Daily/weekly inspection forms for equipment and work areas
8. Environmental Monitoring Forms: Templates for recording dust, noise, and vibration monitoring
9. Permits and Notifications: Copies of relevant permits, consents, and notifications
10. Safety Data Sheets: SDS for any hazardous materials that may be encountered or used
Construction
Civil Engineering
Industrial
Commercial Property
Infrastructure
Mining
Manufacturing
Waste Management
Demolition Services
Property Development
Health and Safety
Operations
Project Management
Construction
Quality Assurance
Environmental Compliance
Risk Management
Engineering
Site Operations
Demolition
Demolition Manager
Health and Safety Manager
Site Supervisor
Project Manager
Construction Manager
Risk Assessment Officer
Environmental Compliance Officer
Structural Engineer
Safety Consultant
Operations Manager
Site Engineer
Quality Control Inspector
Construction Supervisor
Demolition Operative
Plant Operator
Find the exact document you need
Scaffold Risk Assessment And Method Statement
A New Zealand-compliant safety and methodology document for scaffolding works, combining risk assessment and detailed work procedures under NZ health and safety legislation.
Cleaning Risk Assessment And Method Statement
A New Zealand-compliant document that combines risk assessment and detailed methodology for safe cleaning operations, adhering to local health and safety regulations.
Method Statement For Demolition Of Concrete Slab
A technical document outlining procedures and safety requirements for concrete slab demolition under New Zealand health and safety regulations.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it


.png)