1. Project Information: Details of the project location, scope, and concrete slab specifications
2. Site Assessment: Evaluation of site conditions, access points, and surrounding structures
3. Risk Assessment: Identification and assessment of potential hazards and control measures
4. Personnel and Responsibilities: List of key personnel, their roles, and responsibilities
5. Equipment and Resources: Details of machinery, tools, and resources required for the demolition
6. Safety Measures: Comprehensive safety protocols, PPE requirements, and control measures
7. Demolition Methodology: Step-by-step procedure for the demolition process
8. Environmental Control Measures: Dust suppression, noise control, and waste management procedures
9. Emergency Procedures: Emergency response plans and contact information
10. Site Clean-up and Restoration: Procedures for debris removal and site restoration
1. Hazardous Materials Management: Required if asbestos or other hazardous materials are present in or around the concrete slab
2. Utility Protection Measures: Required if live utilities are present near the demolition area
3. Traffic Management Plan: Required for sites adjacent to public roads or with significant vehicle movement
4. Vibration Monitoring: Required when demolition is near sensitive structures or equipment
5. Temporary Works Design: Required if temporary supports or protection systems are needed
6. Public Protection Measures: Required for demolition in public areas or occupied buildings
1. Schedule A - Site Plan: Detailed site layout showing demolition area, access points, and safety zones
2. Schedule B - Risk Assessment Matrix: Detailed risk assessment tables and control measures
3. Schedule C - Equipment Specifications: Technical specifications of major equipment to be used
4. Schedule D - Safety Data Sheets: SDS for any chemicals or hazardous materials involved
5. Schedule E - Permits and Licenses: Copies of relevant permits, licenses, and authorizations
6. Schedule F - Emergency Contact List: Comprehensive list of emergency contacts and procedures
7. Schedule G - Training Records: Certificates and qualifications of key personnel
8. Schedule H - Inspection Checklists: Daily inspection and safety check forms
Construction
Civil Engineering
Industrial
Commercial Real Estate
Infrastructure
Mining
Manufacturing
Urban Development
Waste Management
Environmental Services
Health and Safety
Operations
Project Management
Quality Assurance
Environmental Compliance
Risk Management
Engineering
Construction
Site Operations
Regulatory Compliance
Project Manager
Site Supervisor
Health and Safety Manager
Demolition Supervisor
Construction Manager
Environmental Compliance Officer
Risk Assessment Officer
Quality Control Inspector
Operations Manager
Safety Coordinator
Civil Engineer
Structural Engineer
Construction Superintendent
Environmental Manager
Compliance Officer
Find the exact document you need
Slab Coring Method Statement
A Canadian-compliant technical document outlining safe methodology and requirements for concrete slab coring operations, including safety procedures and regulatory compliance measures.
Scaffold Risk Assessment And Method Statement
A Canadian-compliant safety and methodology document for scaffolding operations, combining risk assessment and detailed work procedures under federal and provincial regulations.
Method Statement For Demolition Of Concrete Slab
A Canadian-compliant technical document outlining safe procedures and methodologies for concrete slab demolition operations.
Painting Risk Assessment And Method Statement
A Canadian-compliant safety and methodology document for painting operations, combining risk assessment and detailed work procedures in accordance with federal and provincial regulations.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it


.png)