Ƶ

Baseline Risk Assessment for Malaysia

Baseline Risk Assessment Template for Malaysia

A comprehensive workplace safety document mandated under Malaysian law, specifically aligned with the Occupational Safety and Health Act 1994 and DOSH guidelines. This assessment systematically identifies, evaluates, and proposes control measures for workplace hazards across all operational areas. It includes detailed analysis of potential risks, current safety measures, and recommendations for improvements, serving as a foundational document for workplace safety management and compliance in Malaysian business operations.

Your data doesn't train Genie's AI

You keep IP ownership of your information

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Download a Standard Template

4.6 / 5
4.8 / 5
Access for free
OR

Alternatively: Run an advanced review of an existing
Baseline Risk Assessment

Let Ƶ's market-leading legal AI identify missing terms, unusual language, compliance issues and more - in just seconds.

What is a Baseline Risk Assessment?

The Baseline Risk Assessment is a fundamental workplace safety document required under Malaysian legislation, particularly the Occupational Safety and Health Act 1994. This document serves as the primary tool for organizations to systematically identify, assess, and control workplace hazards in compliance with DOSH requirements. It must be conducted when establishing new operations, implementing significant changes to existing processes, or as part of regular safety reviews. The assessment covers physical, chemical, biological, and ergonomic hazards, evaluating their potential impact on worker safety and proposing appropriate control measures. Regular updates are required to ensure continued relevance and effectiveness of safety measures.

What sections should be included in a Baseline Risk Assessment?

1. Document Information: Document control information including assessment date, reference number, and revision history

2. Assessment Team: Details of team members conducting the assessment, including their qualifications and roles

3. Scope of Assessment: Clear definition of the workplace areas, processes, and activities covered by the assessment

4. Methodology: Description of risk assessment methods, scoring systems, and criteria used

5. Hazard Identification: Systematic listing and description of all identified workplace hazards

6. Risk Analysis: Evaluation of likelihood and severity of identified hazards, including current control measures

7. Risk Evaluation: Assessment of risk levels and prioritization of hazards

8. Risk Control Recommendations: Proposed additional control measures following the hierarchy of controls

9. Action Plan: Timeline and responsibilities for implementing recommended control measures

10. Review and Monitoring: Schedule and procedures for reviewing the effectiveness of control measures

What sections are optional to include in a Baseline Risk Assessment?

1. Industry-Specific Risk Factors: Used when assessment covers specialized industry hazards requiring specific analytical approaches

2. Environmental Impact Assessment: Include when operations have significant environmental risks or implications

3. Emergency Response Procedures: Added when assessment identifies high-risk scenarios requiring specific emergency protocols

4. Cost-Benefit Analysis: Optional section for analyzing the financial implications of proposed control measures

5. Training Requirements: Include when new control measures require specific staff training programs

What schedules should be included in a Baseline Risk Assessment?

1. Appendix A: Risk Assessment Matrix: Detailed risk scoring matrix and evaluation criteria used

2. Appendix B: Hazard Checklist: Comprehensive checklist of potential hazards by category

3. Appendix C: Control Measure Register: Detailed listing of existing and proposed control measures

4. Appendix D: Incident History: Summary of relevant past incidents and their analysis

5. Appendix E: Equipment Register: List of equipment and machinery assessed, including safety features

6. Appendix F: Chemical Register: Inventory of hazardous substances with safety data sheets

7. Appendix G: Assessment Forms: Blank and completed risk assessment forms used during the evaluation

8. Appendix H: Reference Documents: List of relevant standards, guidelines, and regulations referenced

Authors

Alex Denne

Head of Growth (Open Source Law) @ Ƶ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents | Serial Founder & Legal AI Author

Jurisdiction

Malaysia

Publisher

Ƶ

Cost

Free to use
Relevant legal definitions






























Clauses




















Relevant Industries

Manufacturing

Construction

Oil and Gas

Chemical Processing

Mining

Agriculture

Healthcare

Logistics and Warehousing

Food Processing

Automotive

Electronics Manufacturing

Pharmaceutical

Utilities

Transportation

Relevant Teams

Health and Safety

Operations

Quality Assurance

Compliance

Production

Maintenance

Environmental

Risk Management

Human Resources

Facility Management

Relevant Roles

Health and Safety Manager

Risk Assessment Officer

Operations Manager

Facility Manager

Environmental Health Officer

Production Supervisor

Quality Control Manager

Compliance Officer

Industrial Hygienist

Plant Manager

Safety Engineer

Process Safety Specialist

Occupational Health Nurse

Environmental Manager

Maintenance Supervisor

Industries







Teams

Employer, Employee, Start Date, Job Title, Department, Location, Probationary Period, Notice Period, Salary, Overtime, Vacation Pay, Statutory Holidays, Benefits, Bonus, Expenses, Working Hours, Rest Breaks,  Leaves of Absence, Confidentiality, Intellectual Property, Non-Solicitation, Non-Competition, Code of Conduct, Termination,  Severance Pay, Governing Law, Entire Agreemen

Find the exact document you need

Planning And Risk Assessment In Auditing

A Malaysian-compliant audit planning and risk assessment framework aligned with local regulations and international auditing standards.

Download

Fire Risk Assessment Policy

A policy document outlining fire risk assessment procedures and requirements in compliance with Malaysian fire safety regulations and BOMBA guidelines.

Download

IT Risk Assessment Matrix

A Malaysian-compliant IT Risk Assessment Matrix for systematic evaluation and management of IT-related risks, aligned with local regulations and international standards.

Download

Hazard And Risk Assessment Form

A Malaysian-compliant workplace safety document for systematic hazard identification, risk assessment, and control measure implementation as required by DOSH regulations.

Download

Field Hazard Assessment Form

A Malaysian regulatory-compliant form for assessing and documenting workplace hazards in field operations, aligned with DOSH requirements and OSH Act 1994.

Download

Risk Assessment Policy

A Malaysian-compliant policy document establishing procedures and frameworks for organizational risk assessment and management.

Download

Client Risk Assessment Questionnaire

A Malaysian-compliant questionnaire for assessing client risk profiles and investment suitability in accordance with local financial regulations.

Download

Risk Assessment Matrix Oil And Gas

A structured risk assessment framework for oil and gas operations in Malaysia, aligned with local regulations and industry standards.

Download

Quality Risk Assessment SOP

A Standard Operating Procedure for quality risk assessment processes compliant with Malaysian pharmaceutical regulations and GMP guidelines.

Download

Hazard Assessment Process

A Malaysian-compliant framework document for systematic workplace hazard identification, assessment, and control procedures in accordance with DOSH guidelines.

Download

Risk Assessment Letter

A formal risk evaluation document compliant with Malaysian regulations that identifies, analyzes, and provides mitigation strategies for business-related risks.

Download

Risk Assessment Document Software Development

A risk assessment framework for software development projects compliant with Malaysian legislation and industry standards.

Download

Plant And Equipment Risk Management Form

A Malaysian-compliant risk management form for systematic assessment and control of industrial plant and equipment hazards, aligned with DOSH requirements.

Download

Electrical Design Risk Assessment

A Malaysian-compliant technical assessment document that identifies and addresses risks in electrical design installations, following Energy Commission requirements and national safety standards.

Download

E Signature Risk Assessment

A risk assessment document for e-signature implementation in Malaysia, analyzing legal compliance, technical security, and operational risks under Malaysian law.

Download

Activity Based Risk Assessment Form Mom

A Malaysian regulatory document for systematic workplace risk assessment and control measures, compliant with DOSH requirements.

Download

Project Assessment Matrix

A structured project evaluation framework compliant with Malaysian regulations, providing comprehensive criteria for systematic project assessment and decision-making.

Download

Risk Assessment For Grass Cutting And Strimming

Malaysian-compliant risk assessment document for grass cutting and strimming operations, aligned with OSH Act 1994 requirements.

Download

Threat And Hazard Identification And Risk Assessment Guide

A Malaysian-compliant guide for systematic workplace hazard identification and risk assessment, aligned with DOSH requirements.

Download

Supplier Security Assessment Questionnaire

A Malaysian-compliant security assessment tool for evaluating supplier security controls and regulatory compliance under Malaysian law.

Download

Baseline Risk Assessment

A mandatory workplace safety assessment document under Malaysian law that identifies and evaluates occupational hazards and control measures.

Download

Vulnerability Assessment Matrix

A Malaysian-compliant security assessment framework for identifying and evaluating system vulnerabilities and providing remediation recommendations.

Download

Method Statement And Risk Assessment For Landscaping

A Malaysian-compliant method statement and risk assessment document detailing safe landscaping procedures and hazard controls.

Download

Hazard Identification Form

A Malaysian regulatory compliance document for systematic workplace hazard identification and assessment under DOSH guidelines.

Download

Procurement Risk Assessment Matrix

A structured risk assessment tool for procurement activities in Malaysia, ensuring regulatory compliance and effective risk management in procurement processes.

Download

Scaffold Risk Assessment And Method Statement

A Malaysian-compliant safety document combining risk assessment and detailed work procedures for safe scaffolding operations under DOSH regulations.

Download

Tile Manual Handling Risk Assessment

A Malaysian-compliant risk assessment template for tile manual handling operations, aligned with DOSH guidelines and local safety regulations.

Download

Preliminary Risk Assessment Audit

A Malaysian-compliant preliminary risk assessment audit document that evaluates organizational hazards and provides risk control recommendations under local safety regulations.

Download

Pre Tender Risk Assessment

A Malaysian jurisdiction document for evaluating and analyzing risks associated with tender participation, ensuring compliance with local procurement requirements.

Download

Compliance Risk Assessment Questionnaire

A comprehensive compliance risk assessment tool aligned with Malaysian regulatory requirements, helping organizations evaluate their compliance framework and identify potential risks.

Download

Manual Handling Risk Assessment Tool

A comprehensive risk assessment tool for manual handling operations, compliant with Malaysian safety regulations and DOSH guidelines.

Download

Manual Handling Assessment Chart

A Malaysian-compliant risk assessment tool for evaluating manual handling operations under DOSH guidelines.

Download

Emergency Preparedness Risk Assessment

A Malaysian-compliant emergency risk assessment document that evaluates potential hazards and establishes preparedness measures for organizations.

Download

Document Control Risk Assessment

A Malaysian-compliant risk assessment framework for evaluating and managing document control risks within organizations, aligned with local regulations and best practices.

Download

Criticality Assessment Matrix

A Malaysian-compliant framework for assessing and categorizing business-critical elements and associated risks, aligned with local regulations and international standards.

Download

Environmental Risk Assessment Matrix

A structured framework for assessing and managing environmental risks in Malaysian business operations, aligned with local environmental regulations and standards.

Download

IT Risk Assessment Policy

A comprehensive IT risk assessment framework aligned with Malaysian regulations and industry best practices for systematic evaluation and management of technology risks.

Download

Generic Risk Assessment

A Malaysian-compliant risk assessment document for systematic evaluation of workplace hazards and control measures under local safety regulations.

Download

Security Assessment Report

A Malaysian-compliant security assessment report detailing organizational security vulnerabilities, risks, and remediation recommendations.

Download

Risk Assessment Report

A Malaysian regulatory compliance document that assesses workplace hazards and risks, providing control measures and action plans under DOSH guidelines.

Download
See more related templates

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it