Ƶ

Slab Coring Method Statement for Saudi Arabia

Slab Coring Method Statement Template for Saudi Arabia

A comprehensive technical document outlining the methodology, safety procedures, and quality control measures for concrete slab coring operations in Saudi Arabia. The document adheres to Saudi Building Code requirements and local construction regulations, providing detailed guidance on equipment usage, risk assessment, environmental controls, and emergency procedures. It ensures compliance with Saudi Arabian health and safety regulations while maintaining international best practices for concrete cutting and coring operations.

Your data doesn't train Genie's AI

You keep IP ownership of your information

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Download a Standard Template

4.6 / 5
4.8 / 5
Access for free
OR

Alternatively: Run an advanced review of an existing
Slab Coring Method Statement

Let Ƶ's market-leading legal AI identify missing terms, unusual language, compliance issues and more - in just seconds.

What is a Slab Coring Method Statement?

The Slab Coring Method Statement is a critical operational document required for any construction project in Saudi Arabia involving concrete cutting and coring activities. This document is essential for ensuring safe and compliant execution of coring works, particularly given the stringent requirements of Saudi Arabian construction regulations and the challenging local environmental conditions. The method statement provides comprehensive guidance on pre-operation surveys, execution procedures, safety measures, and quality control requirements. It is typically required for building modifications, infrastructure upgrades, and renovation projects where precise concrete cutting is necessary. The document must be prepared in accordance with Saudi Building Code (SBC) requirements and requires approval from relevant authorities before work commencement.

What sections should be included in a Slab Coring Method Statement?

1. 1. Document Control: Document reference numbers, revision history, and approval status

2. 2. Project Information: Project details, location, client information, and scope of coring works

3. 3. References: Applicable standards, codes, and regulations including Saudi Building Code requirements

4. 4. Definitions: Technical terms and abbreviations used in the method statement

5. 5. Resources: Personnel, equipment, and materials required for the coring operation

6. 6. Risk Assessment: Identification and evaluation of potential hazards and control measures

7. 7. Safety Requirements: PPE, permits, and safety procedures complying with Saudi regulations

8. 8. Environmental Controls: Dust suppression, slurry management, and noise control measures

9. 9. Pre-Operation Requirements: Site preparation, utilities identification, and preliminary surveys

10. 10. Operational Procedure: Step-by-step coring methodology and execution process

11. 11. Quality Control: Inspection criteria, testing requirements, and acceptance standards

12. 12. Emergency Procedures: Response plans for potential incidents and emergency situations

What sections are optional to include in a Slab Coring Method Statement?

1. Structural Engineering Assessment: Required when coring in critical structural elements or when core diameter exceeds standard sizes

2. Ground Penetrating Radar Survey: Include when working in areas with unknown services or reinforcement layout

3. Temporary Works Design: Required when temporary support structures are needed during coring operations

4. Noise Management Plan: Include when working in noise-sensitive areas or during restricted hours

5. Traffic Management Plan: Required when coring operations affect vehicle or pedestrian movement

6. Concrete Repair Methodology: Include when post-coring repairs are part of the scope

What schedules should be included in a Slab Coring Method Statement?

1. Appendix A - Risk Assessment Matrix: Detailed risk assessment tables and control measures

2. Appendix B - Equipment Specifications: Technical specifications and calibration certificates for coring equipment

3. Appendix C - Personnel Certificates: Operator qualifications and training certificates

4. Appendix D - Inspection Forms: Quality control checklists and inspection forms

5. Appendix E - Site Layout Plans: Drawings showing coring locations and access routes

6. Appendix F - Emergency Contact List: Emergency contacts and response procedures

7. Appendix G - Method Statement Briefing Record: Record of toolbox talks and worker briefings

8. Appendix H - Permits and Approvals: Copies of relevant permits and regulatory approvals

Authors

Alex Denne

Head of Growth (Open Source Law) @ Ƶ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents | Serial Founder & Legal AI Author

Jurisdiction

Saudi Arabia

Publisher

Ƶ

Document Type

Method Statement

Cost

Free to use
Relevant legal definitions


























Clauses




















Relevant Industries

Construction

Civil Engineering

Infrastructure Development

Commercial Real Estate

Industrial Construction

Residential Development

Healthcare Construction

Educational Facilities

Oil and Gas

Manufacturing

Retail Construction

Relevant Teams

Construction Operations

Health and Safety

Quality Control

Project Management

Engineering

Technical Services

Risk Management

Site Operations

Compliance

Operations

Relevant Roles

Construction Manager

Project Engineer

Health and Safety Manager

Quality Control Manager

Site Supervisor

Civil Engineer

Structural Engineer

Construction Foreman

Safety Officer

Quality Inspector

Construction Superintendent

Project Director

Technical Manager

Risk Assessment Specialist

Operations Manager

Industries








Teams

Employer, Employee, Start Date, Job Title, Department, Location, Probationary Period, Notice Period, Salary, Overtime, Vacation Pay, Statutory Holidays, Benefits, Bonus, Expenses, Working Hours, Rest Breaks,  Leaves of Absence, Confidentiality, Intellectual Property, Non-Solicitation, Non-Competition, Code of Conduct, Termination,  Severance Pay, Governing Law, Entire Agreemen

Find the exact document you need

Method Statement For Cable Glanding And Termination

A technical procedure document for cable glanding and termination operations that complies with Saudi Arabian electrical regulations and SASO standards.

Download

Method Statement For Cutting Concrete Slab

A technical procedure document for concrete slab cutting operations, compliant with Saudi Arabian construction and safety regulations.

Download

Slab Coring Method Statement

A technical document detailing concrete slab coring procedures and safety measures in accordance with Saudi Arabian construction regulations.

Download

Method Statement And Risk Assessment For Landscaping

A detailed procedural and safety document for landscaping operations in Saudi Arabia, complying with local regulations and environmental conditions.

Download

Scaffold Risk Assessment And Method Statement

A Saudi Arabian compliant safety document detailing risk assessment and methodology for safe scaffolding operations, adhering to local regulations and international standards.

Download

Site Specific Risk Assessment And Method Statement

A Saudi Arabia-compliant safety document combining site-specific risk assessment and detailed work methodology to ensure safe project execution and regulatory compliance.

Download

Method Statement For Column Formwork

A technical guide for column formwork installation and removal procedures in Saudi Arabian construction projects, ensuring compliance with local regulations and safety standards.

Download

Method Statement For Demolition Of Concrete Slab

A technical document outlining methodology and safety procedures for concrete slab demolition, compliant with Saudi Arabian regulations and building codes.

Download

Painting Risk Assessment And Method Statement

A Saudi Arabia-compliant risk assessment and method statement outlining safety procedures and operational guidelines for painting works.

Download

Carpentry Risk Assessment And Method Statement

A safety and methodology document for carpentry operations in Saudi Arabia, ensuring compliance with Saudi Labor Law and construction safety regulations.

Download
See more related templates

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it