1. 1. Document Information: Document control information including revision history, document number, and approval status
2. 2. Project Details: Specific project information, location, client details, and scope of concrete cutting work
3. 3. Purpose and Scope: Defines the objective of the method statement and the extent of work covered
4. 4. References: List of relevant standards, codes, and regulations including Qatar Construction Specifications
5. 5. Definitions: Key terms and abbreviations used in the document
6. 6. Responsibilities: Roles and responsibilities of key personnel involved in the concrete cutting operation
7. 7. Risk Assessment: Identification of hazards and control measures specific to concrete cutting
8. 8. Required Resources: List of equipment, tools, PPE, and manpower required for the operation
9. 9. Safety Requirements: Detailed safety measures, PPE requirements, and emergency procedures
10. 10. Pre-cutting Survey: Requirements for structural assessment and utility scanning
11. 11. Method of Execution: Step-by-step procedure for concrete cutting operation
12. 12. Quality Control: Quality checks, tolerances, and acceptance criteria
13. 13. Environmental Controls: Dust suppression, noise control, and waste management measures
14. 14. Emergency Procedures: Response procedures for potential emergency situations
1. Specialized Equipment Details: Detailed specifications of specialized cutting equipment when non-standard tools are required
2. Traffic Management Plan: Required when cutting operations affect vehicle or pedestrian traffic
3. Temporary Works: Details of temporary support structures if required for structural stability
4. Night Work Procedures: Additional requirements when concrete cutting needs to be performed at night
5. Concrete Reinforcement Management: Special procedures when dealing with heavily reinforced concrete
6. Cooling System Requirements: Specific requirements for water cooling systems in hot weather conditions
7. Noise Management Plan: Detailed noise control measures when working in noise-sensitive areas
1. Appendix A - Risk Assessment Matrix: Detailed risk assessment tables and control measures
2. Appendix B - Equipment Specifications: Technical specifications of cutting equipment and tools
3. Appendix C - Safety Data Sheets: SDS for any chemicals or materials used in the process
4. Appendix D - Inspection Checklists: Pre-start and operational inspection checklists
5. Appendix E - Training Records: Certificates and qualifications of personnel
6. Appendix F - Drawing Package: Relevant drawings showing cutting locations and details
7. Appendix G - Emergency Contact List: List of emergency contacts and response procedures
8. Appendix H - Permits: Copies of required work permits and approvals
Construction
Infrastructure Development
Industrial Manufacturing
Oil and Gas
Commercial Real Estate
Residential Development
Civil Engineering
Demolition and Renovation
Public Works
Marine and Offshore
Health Safety and Environment
Construction Operations
Quality Control
Project Management
Site Operations
Technical Services
Risk Assessment
Compliance and Regulatory Affairs
Environmental Management
Engineering
Site Supervision
Project Manager
Site Engineer
Health and Safety Officer
Construction Manager
Quality Control Engineer
Concrete Cutting Specialist
Site Supervisor
Structural Engineer
Risk Assessment Officer
Environmental Compliance Officer
Construction Foreman
Technical Director
Operations Manager
Permit Coordinator
Construction Safety Specialist
Find the exact document you need
Method Statement For Cutting Concrete Slab
A detailed procedural document for concrete slab cutting operations in Qatar, complying with QCS and local HSE regulations.
Method Statement And Risk Assessment For Landscaping
A Qatar-compliant method statement and risk assessment document for landscaping operations, detailing safety procedures and work methodologies.
Scaffold Risk Assessment And Method Statement
A mandatory safety document under Qatar law that details risk assessment and methodologies for scaffold operations, ensuring compliance with local construction and safety regulations.
Site Specific Risk Assessment And Method Statement
A mandatory safety planning document under Qatar law that combines site-specific risk assessment with detailed work procedures and control measures for construction and industrial projects.
Method Statement For Column Formwork
A technical procedure document for column formwork operations in Qatar, complying with QCS 2014 and local construction regulations.
Method Statement For Demolition Of Concrete Slab
A comprehensive method statement for concrete slab demolition operations in Qatar, outlining safety procedures and regulatory compliance requirements.
Painting Risk Assessment And Method Statement
A Qatar-compliant document detailing risk assessment and safe working procedures for painting operations, ensuring adherence to local HSE regulations and labor laws.
Method Statement And Risk Assessment For Excavation
A technical and safety compliance document required under Qatar law that details excavation methodology and risk assessment procedures.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it


.png)