1. Project Information: Details of the project, location, client, and contractor information
2. Scope of Work: Detailed description of the column formwork activities to be undertaken
3. Reference Documents: List of applicable standards, codes, and specifications
4. Materials and Equipment: Specifications of formwork materials, tools, and equipment to be used
5. Resource Requirements: Details of labor, supervision, and competency requirements
6. Safety Requirements: Specific safety measures, PPE requirements, and risk assessments
7. Installation Procedure: Step-by-step process for formwork assembly, including measurements and tolerances
8. Quality Control: Inspection points, acceptance criteria, and quality assurance measures
9. Emergency Procedures: Response protocols for potential emergencies during formwork operations
1. Environmental Controls: Specific environmental protection measures, used when working in environmentally sensitive areas
2. Special Design Considerations: Additional requirements for complex column designs or unusual shapes
3. Interface Management: Coordination with other trades, used when working in congested areas
4. Concrete Placement Method: Specific requirements for concrete placement, used when this affects formwork design
5. Weather Protection Measures: Additional measures for extreme weather conditions, used in exposed areas
1. Risk Assessment: Detailed assessment of risks associated with formwork operations
2. Inspection Checklist: Detailed checklist for formwork inspection before concrete placement
3. Equipment Schedule: List of all equipment with specifications and inspection certificates
4. Material Specifications: Detailed specifications of all formwork materials to be used
5. Drawing Register: List of relevant drawings and sketches for formwork installation
6. Training Records: Certificates and competency records of key personnel
7. Emergency Contact List: List of emergency contacts and response team members
Commercial Construction
Industrial Construction
Infrastructure Development
Residential Development
Mining Infrastructure
Public Works
Civil Engineering
High-rise Construction
Construction
Engineering
Health and Safety
Quality Assurance
Project Management
Technical Services
Site Operations
Risk Management
Compliance
Operations
Construction Manager
Site Engineer
Safety Manager
Quality Control Manager
Project Manager
Formwork Supervisor
Construction Foreman
Structural Engineer
Risk Assessment Officer
Health and Safety Officer
Construction Director
Technical Director
Site Supervisor
Quality Assurance Engineer
Find the exact document you need
Method Statement For Cable Glanding And Termination
A South African regulatory-compliant technical document detailing procedures and safety requirements for cable glanding and termination operations.
Contractor Method Statement
A South African regulatory document that details safe work procedures and risk management for specific construction activities, complying with OHSA requirements.
Method Statement For Cutting Concrete Slab
A South African-compliant technical document outlining methodology and safety procedures for concrete slab cutting operations, aligned with local OHS regulations.
Site Specific Risk Assessment And Method Statement
A South African regulatory compliance document that details site-specific hazards, risk assessments, and safe work procedures as required by OHS Act and Construction Regulations.
Method Statement For Column Formwork
A technical document outlining procedures and safety requirements for column formwork installation in South African construction projects, compliant with local regulations and SANS standards.
Method Statement For Demolition Of Concrete Slab
A technical document outlining methodology and safety procedures for concrete slab demolition in accordance with South African regulations.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it


.png)