Ƶ

Your data doesn't train Genie's AI

You keep IP ownership of your information

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Download a Standard Template

4.6 / 5
4.8 / 5
Access for free
OR

Alternatively: Run an advanced review of an existing
Contractor Method Statement

Let Ƶ's market-leading legal AI identify missing terms, unusual language, compliance issues and more - in just seconds.

What is a Contractor Method Statement?

The Contractor Method Statement is a mandatory document required under Danish workplace safety regulations for significant construction and industrial projects. It serves as a crucial planning and safety management tool, detailing how specific work activities will be carried out safely and efficiently. The document is required by the Danish Working Environment Authority (Arbejdstilsynet) and must comply with the Working Environment Act and related executive orders. The Method Statement includes comprehensive information about work procedures, risk controls, emergency measures, and environmental protection requirements. It is particularly important for high-risk activities or complex operations where detailed planning and safety measures are essential. The document must be prepared before work commences and should be readily available for inspection by relevant authorities and workers.

What sections should be included in a Contractor Method Statement?

1. Project Information: Details of the project, location, client, and contractor information

2. Scope of Works: Detailed description of the work activities covered by this method statement

3. Risk Assessment Reference: Reference to associated risk assessments and key hazards identified

4. Personnel: Details of key personnel, their roles, responsibilities, and qualifications

5. Work Methodology: Step-by-step description of how the work will be carried out

6. Equipment and Materials: List of equipment, tools, and materials to be used, including specifications

7. Safety Measures: Specific safety controls and measures to be implemented

8. Personal Protective Equipment: Required PPE for different activities

9. Environmental Protection: Measures to protect the environment and manage waste

10. Emergency Procedures: Emergency response procedures and contact information

What sections are optional to include in a Contractor Method Statement?

1. Noise Management: Required when work involves significant noise generation in sensitive areas

2. Traffic Management: Needed when work affects public roads or requires vehicle movements

3. Working at Height: Required for any activities involving work at height

4. Confined Space Entry: Necessary when work involves entering confined spaces

5. Lifting Operations: Required for work involving cranes or other lifting equipment

6. Hazardous Substances: Needed when work involves use of dangerous materials

7. Temporary Works: Required when temporary structures or supports are needed

8. Permit to Work Requirements: For high-risk activities requiring specific permits

What schedules should be included in a Contractor Method Statement?

1. Risk Assessment: Detailed risk assessment for the specific work activities

2. Equipment Certificates: Copies of inspection certificates for key equipment

3. Training Records: Relevant training certificates for personnel

4. Site Layout Plan: Drawings showing work areas, access routes, and safety facilities

5. Emergency Contact List: List of emergency contacts and procedures

6. COSHH Assessments: Assessment sheets for hazardous substances

7. Inspection Checklists: Daily/weekly inspection forms for equipment and work areas

8. Toolbox Talk Records: Templates and records of safety briefings

Authors

Alex Denne

Head of Growth (Open Source Law) @ Ƶ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents | Serial Founder & Legal AI Author

Relevant legal definitions






























Clauses




















Relevant Industries

Construction

Infrastructure

Manufacturing

Industrial

Energy

Utilities

Marine

Transportation

Telecommunications

Mining and Resources

Oil and Gas

Renewable Energy

Relevant Teams

Health Safety Environment

Operations

Project Management

Quality Assurance

Risk Management

Construction

Engineering

Compliance

Site Operations

Technical Services

Relevant Roles

Project Manager

Health and Safety Manager

Site Supervisor

Construction Manager

Safety Coordinator

Operations Manager

Risk Manager

Environmental Compliance Officer

Quality Control Manager

Technical Director

Works Manager

Contract Manager

HSE Advisor

Project Engineer

Industries








Teams

Employer, Employee, Start Date, Job Title, Department, Location, Probationary Period, Notice Period, Salary, Overtime, Vacation Pay, Statutory Holidays, Benefits, Bonus, Expenses, Working Hours, Rest Breaks,  Leaves of Absence, Confidentiality, Intellectual Property, Non-Solicitation, Non-Competition, Code of Conduct, Termination,  Severance Pay, Governing Law, Entire Agreemen

Find the exact document you need

Contractor Method Statement

A detailed work procedure and safety document compliant with Danish workplace safety regulations, outlining specific methods and control measures for contractor activities.

find out more

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it