Ƶ

Your data doesn't train Genie's AI

You keep IP ownership of your information

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Download a Standard Template

4.6 / 5
4.8 / 5
Access for free
OR

Alternatively: Run an advanced review of an existing
Risk Assessment And Method Statement

Let Ƶ's market-leading legal AI identify missing terms, unusual language, compliance issues and more - in just seconds.

What is a Risk Assessment And Method Statement?

The Free Risk Assessment And Method Statement Template serves as an essential tool for organizations operating within the UAE to systematically evaluate workplace risks and establish safe working procedures. This document is designed to comply with UAE federal safety regulations, including UAE Federal Law No. 8 of 1980, Ministerial Order No. 32 of 1982, and the OSHAD-SF framework. It should be used before commencing any new work activity, during significant operational changes, or when reviewing existing safety measures. The template includes comprehensive sections for hazard identification, risk evaluation, control measures, and step-by-step method statements, making it suitable for various industries and work activities. Regular updates and reviews of this document ensure continuous improvement in safety management and ongoing compliance with UAE safety requirements.

What sections should be included in a Risk Assessment And Method Statement?

1. Document Control Information: Document reference number, revision history, and distribution list

2. Project Information: Basic details including project name, location, scope, and key stakeholders

3. Scope of Works: Detailed description of the work activities being assessed

4. Roles and Responsibilities: Definition of key personnel involved and their safety responsibilities

5. Risk Assessment Methodology: Explanation of risk rating system and assessment criteria used

6. Hazard Identification: Systematic identification of all potential hazards associated with the work

7. Risk Evaluation: Assessment of initial risk levels for each identified hazard

8. Control Measures: Detailed preventive and protective measures to mitigate identified risks

9. Method Statement: Step-by-step description of how work will be carried out safely

10. Emergency Procedures: Response procedures for potential emergency scenarios

11. Training Requirements: Specific training needs and competency requirements for workers

12. PPE Requirements: Details of required Personal Protective Equipment

13. Monitoring and Review: Procedures for ongoing monitoring and review of control measures

14. Sign-off and Approval: Formal approval section for relevant parties

What sections are optional to include in a Risk Assessment And Method Statement?

1. Environmental Impact Assessment: Additional section when work has significant environmental implications

2. Noise Assessment: Detailed noise evaluation for activities with high noise levels

3. COSHH Assessment: Control of Substances Hazardous to Health assessment for works involving dangerous substances

4. Traffic Management Plan: Required when work affects vehicle or pedestrian traffic flow

5. Waste Management: Specific section for projects generating significant waste

6. Working at Height Assessment: Detailed assessment for any works conducted at height

7. Confined Space Entry: Specific procedures when work involves confined space entry

8. Hot Work Permit Requirements: Additional controls for activities involving hot work

What schedules should be included in a Risk Assessment And Method Statement?

1. Risk Assessment Matrix: Standard risk assessment scoring matrix

2. Site Layout Plans: Drawings showing work areas, access points, and emergency routes

3. Equipment Register: List of equipment to be used with inspection certificates

4. Chemical Register: List of hazardous substances with safety data sheets

5. Training Records Template: Template for recording worker training and competency

6. Daily Inspection Checklist: Template for daily safety inspections

7. Incident Report Form: Standard form for reporting accidents or incidents

8. Tool Box Talk Register: Template for recording safety briefings

9. Risk Assessment Review Log: Template for documenting periodic reviews

Authors

Alex Denne

Head of Growth (Open Source Law) @ Ƶ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents | Serial Founder & Legal AI Author

Relevant legal definitions































Clauses




















Relevant Industries

Construction

Manufacturing

Oil and Gas

Mining

Infrastructure Development

Facilities Management

Transportation

Warehousing and Logistics

Healthcare

Utilities

Industrial Processing

Engineering Services

Telecommunications

Waste Management

Relevant Teams

Health, Safety and Environment

Operations

Project Management

Quality Assurance

Compliance

Risk Management

Facilities Management

Engineering

Production

Maintenance

Technical Services

Site Operations

Relevant Roles

Health and Safety Manager

Project Manager

Site Supervisor

Risk Assessment Specialist

Operations Manager

Construction Manager

Facility Manager

HSE Coordinator

Quality Control Manager

Safety Engineer

Environmental Specialist

Technical Director

Compliance Officer

Production Manager

Maintenance Manager

Industries








Teams

Employer, Employee, Start Date, Job Title, Department, Location, Probationary Period, Notice Period, Salary, Overtime, Vacation Pay, Statutory Holidays, Benefits, Bonus, Expenses, Working Hours, Rest Breaks,  Leaves of Absence, Confidentiality, Intellectual Property, Non-Solicitation, Non-Competition, Code of Conduct, Termination,  Severance Pay, Governing Law, Entire Agreemen

Find the exact document you need

High Level Risk Assessment

UAE-compliant template for conducting comprehensive high-level risk assessments, aligned with federal and emirate-specific regulations.

find out more

Modern Slavery Risk Assessment

UAE-compliant template for assessing and documenting organizational exposure to modern slavery risks, aligned with Federal Law No. 51 of 2006 and international standards.

find out more

Diesel Coshh Assessment

UAE-compliant health and safety assessment for controlling risks associated with diesel fuel handling and storage in workplace settings.

find out more

Baseline Risk Assessment

A UAE-compliant systematic assessment document that identifies, analyzes, and provides control measures for workplace hazards and risks, aligned with OSHAD-SF requirements.

find out more

Vulnerability Assessment Matrix

A UAE-compliant security assessment document that systematically identifies and analyzes IT infrastructure vulnerabilities while ensuring alignment with local cybersecurity regulations.

find out more

Method Statement And Risk Assessment For Landscaping

A UAE-compliant document detailing landscaping work methodology and risk assessment procedures, incorporating local safety and environmental requirements.

find out more

Cloud Computing Risk Assessment

A UAE-compliant template for assessing risks associated with cloud computing implementations, ensuring alignment with local data protection and cybersecurity regulations.

find out more

Hospitality Risk Assessment

UAE-compliant risk assessment template for hospitality establishments, addressing operational, safety, and regulatory requirements specific to the Emirates.

find out more

Hazard Identification Form

A UAE-compliant workplace hazard identification and assessment form for documenting and managing workplace safety risks under UAE labor and safety regulations.

find out more

Outside Catering Risk Assessment

UAE-compliant risk assessment template for outdoor catering operations, addressing food safety, environmental, and staff safety requirements under UAE regulations.

find out more

Procurement Risk Assessment Matrix

A comprehensive procurement risk assessment tool aligned with UAE federal procurement laws and regulations, designed to identify, evaluate, and mitigate procurement-related risks.

find out more

Yard Risk Assessment

UAE-compliant template for systematic yard risk assessment, incorporating federal and emirate-specific safety requirements.

find out more

Vulnerable Person Risk Assessment

UAE-compliant risk assessment template for evaluating and protecting vulnerable individuals, aligned with federal laws and regulations.

find out more

Bow Tie Risk Assessment

UAE-compliant bow tie risk assessment template for systematic hazard identification and control measure documentation, aligned with federal HSE regulations.

find out more

Plumbing Risk Assessment

UAE-compliant template for conducting systematic plumbing risk assessments in buildings and facilities, aligned with federal and emirate-specific regulations.

find out more

Asset Criticality Assessment

UAE-compliant template for systematic assessment of asset criticality, incorporating federal and emirate-level requirements for comprehensive asset evaluation and risk assessment.

find out more

Scaffold Risk Assessment And Method Statement

UAE-compliant safety and methodology document for managing scaffold-related risks and procedures in accordance with Federal Law No. 8 of 1980 and OSHAD requirements.

find out more

Financial Crime Risk Assessment

UAE-compliant template for systematic assessment of financial crime risks in financial institutions, aligned with Federal Decree-Law No. 20 of 2018.

find out more

Training Risk Assessment

UAE-compliant template for assessing and managing risks associated with training activities, aligned with federal and local safety regulations.

find out more

System Risk Assessment

A UAE legal template for assessing information system risks, ensuring compliance with local cybersecurity regulations.

find out more

HR Risk Assessment

A UAE-compliant HR Risk Assessment Template for systematic evaluation and management of human resource-related risks within organizations operating under UAE labor laws.

find out more

Solar Pv Risk Assessment

UAE-compliant risk assessment template for solar PV installations, covering design, installation, operation, and maintenance risks under UAE federal and emirate regulations.

find out more

Bank Compliance Risk Assessment

UAE-compliant template for banks to assess and monitor compliance risks in accordance with Central Bank regulations and international standards.

find out more

Data Privacy Risk Assessment

UAE-compliant template for assessing data privacy risks and ensuring compliance with Federal Decree-Law No. 45 of 2021 and related regulations.

find out more

Tile Manual Handling Risk Assessment

UAE-compliant risk assessment document for safe manual handling of tiles, aligned with Federal Law No. 8 of 1980 and local safety regulations.

find out more

Startup Risk Assessment

A UAE-compliant risk assessment framework for startups, covering business, regulatory, and operational risks in both mainland and free zone contexts.

find out more

Standard Risk Assessment Matrix

UAE-compliant risk assessment matrix for systematic evaluation and control of workplace hazards, aligned with federal safety regulations and international standards.

find out more

Site Specific Risk Assessment And Method Statement

A UAE-compliant document that combines risk assessment and method statements for safe work procedures on specific sites, meeting local safety regulations and standards.

find out more

Simple Risk Assessment Matrix

A UAE-compliant risk assessment tool for identifying, evaluating, and controlling workplace hazards in accordance with federal safety regulations.

find out more

Road Risk Assessment

UAE-compliant template for systematic road risk assessment, aligned with federal traffic laws and RTA guidelines.

find out more

Risk Maturity Assessment

UAE-compliant template for assessing organizational risk management maturity levels and identifying areas for improvement.

find out more

Risk Assessment Medical Device

A UAE-compliant risk assessment template for medical devices, aligned with Federal Law No. 8 of 2019 and international standards.

find out more

Remote Deposit Capture Risk Assessment

A UAE-compliant risk assessment template for Remote Deposit Capture services, aligned with Central Bank regulations and banking standards.

find out more

Raw Material Supplier Risk Assessment

A UAE-compliant template for conducting comprehensive risk assessments of raw material suppliers, incorporating local regulatory requirements and international best practices.

find out more

Radiography Risk Assessment

UAE-compliant template for assessing and managing risks associated with radiographic operations, aligned with FANR regulations and federal requirements.

find out more

Preliminary Risk Assessment Audit

A UAE-compliant preliminary assessment document that identifies and evaluates organizational risks, control effectiveness, and recommended mitigation strategies.

find out more

Pre Tender Risk Assessment

A UAE-compliant risk assessment document for evaluating potential risks and feasibility before participating in a tender process, ensuring alignment with local regulations and business requirements.

find out more

Patient Moving And Handling Risk Assessment

A UAE-compliant template for assessing risks in patient moving and handling procedures, ensuring safety standards in healthcare settings.

find out more

Pallet Truck Risk Assessment

UAE-compliant risk assessment template for pallet truck operations, addressing safety requirements under UAE Federal Labor Law and OSHAD guidelines.

find out more

Outdoor Risk Assessment

A UAE legal document ensuring compliance with health and safety regulations for outdoor operations, focusing on risk management.

find out more

OHS Assessment

UAE-compliant occupational health and safety assessment template for systematic workplace safety evaluation and risk management.

find out more

Office Health And Safety Risk Assessment

UAE-compliant office health and safety risk assessment template aligned with Federal Law No. 8 of 1980 and local safety regulations.

find out more

Occupied Building Risk Assessment

UAE-compliant template for conducting comprehensive risk assessments in occupied buildings, aligned with Federal Laws and Civil Defense requirements.

find out more

Occupational Health And Safety Risk Assessment

UAE-compliant template for conducting workplace health and safety risk assessments, aligned with federal labor laws and emirate-specific safety regulations.

find out more

Nursery Childcare Risk Assessment

UAE-compliant risk assessment template for nursery and childcare facilities, ensuring comprehensive safety and regulatory adherence under UAE Federal Laws.

find out more

New Product Risk Assessment

UAE-compliant template for systematic risk assessment of new products, ensuring regulatory compliance and safety standards.

find out more

Nail Salon Risk Assessment

A UAE-compliant risk assessment template for nail salons, addressing health, safety, and operational risks under UAE federal and municipal regulations.

find out more

Manual Handling Tile Risk Assessment

UAE-compliant risk assessment template for manual handling of tiles, aligned with Federal Labor Law requirements and safety regulations.

find out more

Compliance Risk Assessment Questionnaire

UAE-specific compliance risk assessment tool for evaluating organizational adherence to local regulations and identifying potential compliance risks.

find out more

Care Home Risk Assessment

UAE-compliant risk assessment template for care homes, incorporating federal and emirate-level healthcare requirements and safety standards.

find out more

Workplace Assessment

UAE-compliant workplace assessment template for evaluating workplace safety conditions and hazards under UAE Federal Labor Law.

find out more

Manual Handling Risk Assessment Tool

UAE-compliant risk assessment tool for evaluating and managing manual handling risks in the workplace, aligned with Federal Labor Law requirements.

find out more

Manual Handling Assessment Chart

A UAE-compliant technical document for assessing and managing risks associated with workplace manual handling operations, aligned with Federal Labor Law requirements.

find out more

Lift Plan Risk Assessment

A UAE-compliant risk assessment document for lifting operations, outlining hazards, controls, and safety procedures in accordance with federal and local regulations.

find out more

Last Minute Risk Assessment

UAE-compliant template for conducting immediate pre-task safety evaluations, designed to identify and mitigate workplace risks in accordance with local safety regulations.

find out more

Laser Risk Assessment

A UAE-compliant template for comprehensive laser risk assessment and safety management, aligned with federal regulations and international standards.

find out more

Infrastructure Risk Assessment

A UAE-compliant template for comprehensive infrastructure risk assessment, incorporating federal and emirate-specific regulatory requirements.

find out more

Glass And Hard Plastic Risk Assessment

UAE-compliant risk assessment template for evaluating and managing glass and hard plastic hazards in workplace settings.

find out more

Financial Statement Risk Assessment

A UAE-compliant risk assessment document analyzing financial statement risks and controls under UAE federal laws and IFRS standards.

find out more

Farm Risk Assessment

UAE-compliant farm risk assessment template for comprehensive evaluation and management of agricultural operation hazards.

find out more

Factory Risk Assessment

A UAE-compliant template for systematic assessment and documentation of workplace hazards and safety controls in factory environments.

find out more

Empty Risk Assessment

A UAE legal template for systematic workplace risk evaluations, ensuring compliance with occupational health and safety regulations.

find out more

Employee Health Risk Assessment

UAE-compliant template for conducting and documenting employee health risk assessments, ensuring workplace safety and legal compliance.

find out more

Emergency Preparedness Risk Assessment

A UAE-compliant assessment document analyzing emergency risks and preparedness measures, aligned with federal and local emergency management regulations.

find out more

Emergency Lighting Risk Assessment

UAE-compliant template for conducting emergency lighting risk assessments, ensuring compliance with local safety codes and Civil Defense requirements.

find out more

Document Control Risk Assessment

A UAE-compliant risk assessment framework analyzing document control processes, identifying vulnerabilities, and providing risk mitigation recommendations.

find out more

Display Screen Assessment

UAE-compliant template for assessing display screen equipment setups and workplace ergonomics, aligned with Federal Labor Law requirements.

find out more

Desk Risk Assessment

A UAE-compliant template for conducting systematic desk-based risk assessments, aligned with federal and emirate-level safety regulations.

find out more

Criticality Assessment Matrix

A UAE-compliant framework for assessing and categorizing the criticality of business components and systems, aligned with federal laws and risk management requirements.

find out more

Crane Risk Assessment

UAE-compliant crane operations risk assessment template incorporating federal and emirate-level safety requirements and operational guidelines.

find out more

Classroom Risk Assessment

UAE-compliant classroom risk assessment template for educational institutions, aligned with federal and emirate-level safety regulations.

find out more

Business Risk Assessment Questionnaire

A UAE-compliant questionnaire for comprehensive business risk assessment and documentation, aligned with federal and emirate-specific regulations.

find out more

Business Continuity Assessment

UAE-compliant template for assessing organizational business continuity preparedness and risk management capabilities.

find out more

Asset Based Risk Assessment

UAE-compliant template for systematic asset risk assessment, aligned with federal laws and regulatory requirements.

find out more

Assessment Matrix

UAE-compliant assessment matrix template for standardized evaluation of performance, compliance, or capabilities across organizations.

find out more

Asset Management Risk Assessment

UAE-compliant risk assessment template for asset management operations, aligned with Central Bank and SCA regulations.

find out more

Country Risk Assessment

A structured template for assessing business and operational risks in the UAE market, incorporating analysis of federal, emirate-level, and free zone regulations.

find out more

5x5 Risk Assessment

UAE-compliant 5x5 risk assessment template for systematic workplace hazard identification and risk evaluation, aligned with local safety regulations.

find out more

Display Screen Equipment Risk Assessment

UAE-compliant risk assessment template for evaluating display screen equipment usage and workstation safety in accordance with UAE Federal Labor Law.

find out more

Biosecurity Risk Assessment

UAE-compliant template for conducting comprehensive biosecurity risk assessments, aligned with federal regulations and international standards.

find out more

Bank Fraud Risk Assessment

A UAE-compliant template for conducting comprehensive fraud risk assessments in banking institutions, aligned with CBUAE regulations and international best practices.

find out more

Petrol Coshh Assessment

A UAE-compliant hazard assessment document for managing risks associated with petrol handling and storage in the workplace, meeting federal safety regulations.

find out more

Pre Construction Risk Assessment

A UAE-compliant template for systematic pre-construction risk assessment and management, aligned with federal and emirate-level construction safety regulations.

find out more

First Aid Needs Assessment

UAE-compliant template for conducting workplace first aid needs assessments, ensuring regulatory compliance and appropriate first aid provision.

find out more

Excavation Risk Assessment And Method Statement

UAE-compliant risk assessment and methodology document for safe excavation operations, following federal and municipal safety regulations.

find out more

Daily Risk Assessment

A UAE-compliant daily risk assessment template for systematic workplace hazard identification and risk control, aligned with Federal Law No. 8 of 1980 and local safety regulations.

find out more

Fire Department Risk Assessment

UAE-compliant fire risk assessment template aligned with UAE Fire and Life Safety Code requirements for systematic evaluation of fire safety measures and risks.

find out more

HVAC Risk Assessment

UAE-compliant HVAC risk assessment template for systematic evaluation and management of HVAC system risks in accordance with local regulations.

find out more

Construction Site Fire Risk Assessment

UAE-compliant template for conducting comprehensive fire risk assessments on construction sites, meeting federal and emirate-specific safety regulations.

find out more

Process Risk Assessment

A UAE-compliant template for systematic process risk assessment, aligned with federal and emirate-specific regulations for comprehensive risk management.

find out more

Dust Risk Assessment

UAE-compliant template for systematic assessment and control of workplace dust hazards, aligned with federal labor laws and emirate-specific safety regulations.

find out more

Catering Risk Assessment

UAE-compliant risk assessment template for catering operations, covering food safety, workplace safety, and environmental health requirements under UAE Federal Law.

find out more

Ppe Hazard Assessment

A UAE-compliant template for assessing workplace hazards and determining appropriate PPE requirements in accordance with local safety regulations.

find out more

Technical Risk Assessment

UAE-compliant technical risk assessment template for comprehensive evaluation and mitigation of technical risks across industrial operations.

find out more

Environmental Risk Assessment Matrix

A UAE-compliant environmental risk assessment tool for identifying, evaluating, and managing environmental impacts in accordance with federal and emirate-level regulations.

find out more

Flooring Risk Assessment

A UAE-compliant template for systematic assessment of flooring-related risks and safety measures across various building types and environments.

find out more

Procurement Risk Assessment

UAE-compliant template for systematic procurement risk assessment, aligned with Federal Law No. 8 of 2017 and local regulations.

find out more

Individual Risk Assessment

UAE-compliant template for conducting individual workplace risk assessments, aligned with federal labor laws and safety regulations.

find out more

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it